Font Size: a A A

The Research Of New Assistant-decision System For Fault Theatment In Power System Based On OS2

Posted on:2018-09-13Degree:MasterType:Thesis
Country:ChinaCandidate:X ZhangFull Text:PDF
GTID:2322330566454830Subject:Engineering
Abstract/Summary:PDF Full Text Request
With the rapid development of power grids,scheduling business also showed rapid growth trend,but the long print job management service scheduling,single business system operation is a common phenomenon;the operation management system and automation system separate operation,unable to obtain electric net real-time information,all data are required to manually query access control the scheduling management from extensive management to promote fine management.Moreover,the customer service needs to continuously improve the situation,requirements and operation of full service department linkage,but between the current operation and customer communication is still in the phone,especially the power grid accident information,existing method cannot be transferred efficiently,resulting in information delay,even occlusion and other serious conditions.In order to solve the grid fault information collection difficult,slow transmission of information problems,when a large area of power outages and other accidents,ensure the dispatcher can quickly grasp equipment pressure loss,affected scope and number of customers etc..This paper puts forward the construction of power grid dispatching system based on the integration of modern information technology,dispatching automation system,graphics,advanced application data and functions.Further integration of dispatching automation data analysis,combined with the real-time power flow calibration,advanced data analysis application integration,the new operation system formed a more structured,intelligent,humane,safe production to meet the grid.Then,integrate the dispatching automation system switch tripping,pressure loss,pressure loss,SOE bus station accident information data,analysis of information transmission,intelligent building,auxiliary decision-making platform OS2 architecture based on the formation of initial scheduling accident,accident judgment,and the accident treatment process,formation of scheduling decision support platform,structured experts and humanization,meet the power grid safety production needs.In the decision-making platform for scheduling the accident,between the main,distribution,customer service and marketing departments,the construction of emergency information through train,full process control to help operators to achieve network abnormal information collection,analysis,release and update.Therefore,the platform plays a strong supporting role in scheduling operation and customer service,greatly improving the production operation and customer service level of regional power grid.
Keywords/Search Tags:Operating Smart System(OS2), Dispatching operation, Assistant decision, Event sequence, Sequcence of event
PDF Full Text Request
Related items