Study On Improvement Of Risk Control System Of Energy Performance Contracting Of Hunan Yuanneng Co.,Ltd

Posted on:2016-09-20Degree:MasterType:Thesis
Country:ChinaCandidate:W M JiangFull Text:PDF
GTID:2349330473964734Subject:Business Administration
Abstract/Summary:PDF Full Text Request
With the energy crisis and the pollution of the environment, energy saving and emission reduction and sustainable development are the major issues facing the world. In the 70 s of last century in western countries gradually on the rise of energy performance contracting as a new energy conservation service agencies, since the last century 90's incoming China rapid development, but also exposed the problem of high risk.How to control the risk of energy perfoemance contracting project is the key and the core of the energy Services Company,Determine the success or failure of the project.In this paper, we taking the Risk control of energy performance contracting of Hunan Yuanneng Electric Power Development Co., Ltd. as the research object, On the basis of combing literature, And based on the comprehensive risk management theory, Adopting the method of literature review, expert interview and statistical analysis,According to the status quo of the risk control of the energy performance contracting of the company, Analyze the basic reasons and the main risk factors of the project, Combined with the actual situation of the company, the improved ideas and solutions are put forward. First, For the problem of the organization of the company is not sound, in order to improve the company's risk control ability, Put forward to set up the risk management committee under the board, to form a team of experts, and set up risk control department, the department of legal affairs and the ministry of audit; Secondly, Improving according to three stages task features of energy performance contracting project: Project option stage, strengthen macro research and customer analysis, do external risk identification and assessment; Project construction stage, strengthen risk monitoring, construction management, and use of engineering subcontracting transfer risk; Project operation stage, good service, strengthen communication and coordination, to ensure that the project objectives, in order to reduce the risk of payment.Finally, take measures to ensure the normal operation of the risk management system from three aspects: organization, system and personnel.Hope through this energy performance contracting project risk control of the improved scheme can effectively improve the level of energy performance contracting project risk management and control, reduce the project risk of company, protect the development of the company.
Keywords/Search Tags:Hunan Yuanneng Electric Power Co.,Ltd, Energy Performance Contracting, Risk Control
PDF Full Text Request
Related items