Font Size: a A A

Research On Procurement Management Of Equipment For New Industrial Projects

Posted on:2016-10-14Degree:MasterType:Thesis
Country:ChinaCandidate:J LiuFull Text:PDF
GTID:2349330485459594Subject:Project management
Abstract/Summary:PDF Full Text Request
In the process of new project management the buyers has always been of great importance. The main reason is the equipment procurement chain is critical to the success of the new project. However, how can we get the better goods with a reasonable price in the process of equipment procurement, how to avoid risks arises in the procurement, and how to improve the success rate of the project have been the problems which need the project owner to solve? But because it is a new project, the project leaders mostly lack experience and the personnel division of labor in the project is not clear. So all of these cause procurement plans which are not clear written and the imperfect of purchasing management and purchasing contract, archives and other filing is not to be deal with timely. Eventually, the result of chaotic purchasing situation that r makes the purchase of goods cannot achieve the requirements of the buyers or the procurement cost is too large, which reduces the project success rate.This article mainly starts from the perspective of new industrial projects, through the study of the entire procurement process, having found that occurrence problems are easy to arise in each link, and then effectively avoid and solve the various problems in the different stages of procurement.First, this thesis establishes the main objectives and significance of this thesis by collecting materials widely, Later, we are based on the theory of purchasing management and bidding procurement and the risk identification and the method of established process, start from the equipment procurement plan, use the method of module partition to module partition equipment which needs to procurement. And according to reverse order of time sequence, determine procurement equipment time, ultimate subcontract and way of purchasing. Taking the K Company as example, according to methods of risking identification to identify the risk in bidding procurement, for the characteristics of different devices, by setting different bid evaluation method to identify the risks before early to evade. After confirming the bidding business and signing contract, we will manage suppliers and contracts. Eventually form procurement process, which adapts to the new industrial project, so that in the subsequent similar project procurement, it can be for reference.
Keywords/Search Tags:Procurement Management, Bidding Management, Bid Evaluation Method, Supplier Management
PDF Full Text Request
Related items