Font Size: a A A

Research On Legal Issues Of Construction Project Margin

Posted on:2018-06-29Degree:MasterType:Thesis
Country:ChinaCandidate:H LiuFull Text:PDF
GTID:2356330536460433Subject:Law
Abstract/Summary:PDF Full Text Request
Construction project is an important industry of national economic development in our country,as a pillar industry,not only promoted the development of the national economy,but also meet the requirements of millions of lives.Because of the position and function of construction project,was associated with a series of system arises at the historic moment,one of the most can cause arguments is the system of construction project margin.The emergence of the system,to a certain extent,is conducive to the construction smoothly,on the other hand,because of the existence of certain problems,but failed to achieve the desired effect.Regulations on construction project margin is relatively chaotic,lower-level law conflicts with higher-level law,has increased the burden of enterprises at the same time,the existence of these problems hindered the healthy and orderly development of construction market,and even cause serious social problems.To do this,On June 23,2016,the State Council issued “the notice about cleaning specification deposit in the field of engineering construction ”(hereinafter referred to as the " notice "),in order to make the system more perfect,so as to play its proper meaning.In view of this,the author will continue to explore on the basis of this,to find the "notice" enacted the significance,continue to find the existing problems and put forward corresponding Suggestions.Thesis writing is divided into four parts,the first part is from the aspects such as definition classification,respectively discusses the bid bond performance bond deposit migrant wages margin of four types of construction engineering quality deposit At the same time,the author will also pay return properties of four types of deposit,in the form of form,so that the following statements to target again.The second part is a notice issued as the cut-off point,the system of different before and after the notice issued by the contrast,analyzes the meaning of before the notice issued by the system,as well as the notice issued after the progress of the system At the same time,the author of a construction company that he had made empirical research on the construction project of pay deposit,in order to next problem of help.The third part is put forward the problems existing in the construction engineering margin system,in this part,the author respectively and all kinds of construction project from the aspects of the system total margin are analyzed,and find out the problems existing in the system as a whole,both also margin personality problems of every kind of construction project are analyzed.The fourth part is the corresponding Suggestions with the third part,also from the overall construction of deposit and every kind of makes every problem has a different suggestion with the matching,in order to properly solve the problem.
Keywords/Search Tags:Margin system, Construction engineering, Legal issues, Credit system
PDF Full Text Request
Related items