Font Size: a A A

Research On Application Of Six Sigma In The “Project Of Donggou Indemnificatory Housing”

Posted on:2017-12-01Degree:MasterType:Thesis
Country:ChinaCandidate:L GaoFull Text:PDF
GTID:2359330503978220Subject:Project management
Abstract/Summary:PDF Full Text Request
Although average business revenue is going up, the other reasons make the costs go higher such as high price of land?materials?labor cost, also including regulations and controls from the government which are aimed to control the purchase price of the esta tes. The profit rate of property development corporations keeps decreasing, and the market space for property corporations is becoming more narrowness, they will come up to a competition with more fierce. As a Indemnificatory Housing project, which is one of the government's practical projects, it is a problem that how to occupy a territory in the competition based on the premise of quality guaranteed?finish the process on time and make the maximum profit. This will certainly rationalize the management meth ods of the corporations.This study comprehensively analyzed Six Sigma Theory and its main management tools, and further analyzed and summarized the methods and results of its application in the Donggou Indemnificatory Housing Project as a trial. Based on the collection of academic research in related and deep into the Six Sigma, we have realized that the theory has been accepted widely and applied in all kinds of occupations as a mature management theory. Through the analysis on the Donggou Indemnificatory Housing of SHENNENG Real estate company, we investigate the feasibility, and make out its advantages and disadvantages which we have to think about how to solve them. We make a summary of the main tools and ideas of Six Sigma, put emphasis on the application on the architecture program, and its value in use. Also, as an example of energy saving and emission reduction project in this program, we emphasize the application of Six Sigma on wall system under the control of cost. Through investigation, the following aspects require improvements: card the process of energy-saving project, design the optimal process of energy-saving project. analyse the cost of poor quality, make advice of stable improvement, conclude the factor of cost, make a suggestion about hiring engineers for proprietors. Finally, combining the characteristics of Six Sigma management with the project of Indemnificatory Housing, we would like to give the following four pieces specific implementation advice. 1?Manage based on the data and reality. 2?Establish standards in order to improve the management level. 3?Improve business efficiency for saving operating costs. 4?Create a positive corporate culture by establishing a institution.Throughout this research, it is found that, the integrat ive application of Six Sigma management tools can not only improve the quality the project, control the cost of project, period of security project,but also increase corporate culture, raise the comprehensive quality of employee. Also, can promote the management innovation of the corporate, supply the case of project management investigation in this project.Except from the conclusion above, the thesis investigate the application of Six Sigma in the project "Indemnificatory Housing", And the thesis appl y Six Sigma management tools synthetically, also make the advice on project management ?corporate culture building?system of check-ups?system of salary with Six Sigma and learn management. So the worthiness and signification of this investigation on the pro ject can be upgrade to a new level.
Keywords/Search Tags:Six Sigma, Indemnificatory Housing, Cost Of Poor Quality, Management innovation, process improvement
PDF Full Text Request
Related items