With the acceleration of urbanization in our country,the public infrastructure construction has become an important part in the process of urban construction.In public infrastructure construction project,the government investment dominant,the Chinese government should invest RMB as many as several hundreds of billion yuan each year,most of these programs belong to the people’s livelihood practical or significant projects of government investment,the degree of social concern is growing.Shenzhen special economic zone as the forefront of China’s economic reform and innovation in the field of government investment project bidding,after the first to try out the public bidding system,pioneered in qualification review method,pioneered the use of the evaluation mode,the lowest bid first to establish a computer evaluation system,etc.,to standardize the order of construction market,to speed up the construction of bidding and tendering system,"sunshine operations" building construction market mechanism and construction field corrosion protection insurance system provides a valuable experience.Practice proves that the project bidding is to ensure that the construction engineering quality,reduce the project cost,the best way to improve the economic benefits.Shenzhen municipal government investment project construction bidding mechanism innovation research is an interdisciplinary research topic in the field of cross,need to use of organizational behavior,resource management,macroeconomics,microeconomics,mathematical statistics,the theory of principal-agent,game theory and computer network,knowledge,method and means.In this thesis,the government investment engineering characteristics,construction bidding and related concept,the centralized management mode of governance structure,double multi-level principal-agent chain,incentive and constraint and rent-seeking game made a comprehensive study of the system,and the construction bidding game mechanism,between the two sides,game and bidding preferred bidder collusion and the reasonable low price of the game are analyzed in detail,such as commonly used two methods of the evaluation of government investment project are analyzed,focusing on construction business standard evaluation system for the systemic research,put forward to strengthen the bill of quantities,in order to strengthen the management of tender control price and desalination pre-tender estimate innovation measures,such as the evaluation system and the computer has carried on the systematic innovation and design... |