Font Size: a A A

Economic Benefit Evaluation Studies Of High-speed Railway Bridge Accessories Project

Posted on:2017-08-16Degree:MasterType:Thesis
Country:ChinaCandidate:T P WangFull Text:PDF
GTID:2359330518972330Subject:Engineering
Abstract/Summary:PDF Full Text Request
In response to the China North Vehicle Group to develop market, four strategies to implement, to build four major industries of strategic objectives, promote the diversification of the company,enhance the core competitiveness of enterprises, Shen car company through and related manufacturing enterprises and supporting enterprises,units and departments of government deep into contact and understanding, through the comprehensive comparison of market capacity, development space, the price of space, supporting industries, technology content,through the research,it is considered that the engineering machinery industry market is broad, the considerable economic benefits, upstream and downstream complete and perfect,reliable investment projects. Study on the economic evaluation of the Shen car company construction machinery investment projects, provide the basis for the company's investment decisions, the first chapter of this paper discusses the research background, research purpose and significance of the research project, the last stage of research and exploration of the present situation in our country, expounds the the way of discussion and innovation; the second chapter makes a general introduction to the Shenyang car company mechanical engineering projects, including construction scale, production process and unit investment situation, and the construction of investment and financing mode of the paper; the third chapter introduces the main cost of the project expenditure and the expected return is calculated through the financial data project's payback period,net present value and internal rate of return financial, and according to the results of the project preliminary evaluation,from the increase of employment, To evaluate the comprehensive benefits of the project of the three aspects of the regional economy and the impact of environmental protection; the fourth chapter to the project risk assessment, according to the data of the project profit and loss balance analysis and uncertainty, according to the results found that the project risk resistance,then expounds the risk identification scheme of the project,and the risk control measures,and finally display the project the risk in the controllable range; the combination of the fifth chapter, using AHP and fuzzy comprehensive evaluation method, through the operation, the comprehensive evaluation of Shen car company construction machinery investment projects with the data, analyzes the influence degree of various factors on the goal of the project, and the probability of feasible suggestions for this project. Shen car company engineering machinery investment project investment decision.
Keywords/Search Tags:engineering plant, recovery time of investment, economic benefit, Vague evaluation
PDF Full Text Request
Related items