Research On Financing Risk Management Of PPP Project In Infrastructure Construction

Posted on:2018-02-11Degree:MasterType:Thesis
Country:ChinaCandidate:Z CuiFull Text:PDF
GTID:2359330533962181Subject:Engineering
Abstract/Summary:PDF Full Text Request
PPP model is proposed as the private sector can participate in the construction of infrastructure projects with government departments,not only on the risk factors of uncertainty facing the project were reasonable and effective sharing,but also solved the problem of the shortage of government funds.PPP mode financing risk assessment requires qualitative analysis of risk identification based on quantitative analysis to build PPP mode financing risk assessment system,the establishment of appropriate evaluation model,fuzzy comprehensive evaluation method to take their risk evaluation.With respect to the BOT,TOT and other financing models,PPP Project Financing more emphasis on partnership between the public and private sectors,and pay more attention to the efficiency of project construction and implementation,to realize the risk and profit sharing a win-win situation,and not a government department blindly risk transfer to the private sector.Under normal circumstances,PPP project implementation will face a variety of risks,the risks must be on the PPP project financing process may produce a comprehensive in-depth analysis of its corresponding identification and assessment,to be able to achieve effective risk management and control,and therefore risk identification is a key risk control and premise.According to the characteristics and scope of application of risk assessment methods,based on the complexity of the infrastructure of risk management,the paper choose AHP and Grey Evaluation Method.Ongoing index weights index system to determine the weight of which use the network-level analysis,to determine the size of the risk of the use of gray comprehensive evaluation.Heze City W project financing risk level to a lower level,although the risk is relatively small probability or risk of limited impact on the project,but the project still exist certain risks.Characterized in infrastructure PPP project financing risk contagious,infectious,if they are not able to effectively control the risk,the follow-up will have some new risks,the project will bring more and more losses.Therefore,we must,in a timely manner,according to changes in a timely manner to take W project resources,the environment,the actual situation of effective measures to monitor changes in risk,so risk to prevention and relief afterwards.
Keywords/Search Tags:Infrastructure, PPP Project, Financing Risk
PDF Full Text Request
Related items