Font Size: a A A

Research On Matrix Project Management Mode Of Harbin Electric Machinery Company Limited

Posted on:2018-12-24Degree:MasterType:Thesis
Country:ChinaCandidate:H B YuFull Text:PDF
GTID:2359330533968988Subject:Project management
Abstract/Summary:PDF Full Text Request
As the world economy in a deep adjustment period,the downward pressure of economic growth was rising in china,the power equipment requirement in domestic and international market which was remain weak,as well as the country continues to adjust the industrial structure and product structure,Harbin Electric Machinery Co.,Ltd(HEC)’s disadvantage of core competitiveness will be magnified.Facing the continuous intensification of competition in the industry,in the face of product quality,project performance,cost control,service level,financial pressure,a variety of complex issues,it is only through imporve the management level which can achieve the maximum enterprise operation efficiency and benefit.Management idea is to optimize the management mode,along with enterprise development and market condition change,the traditional line and staff organization management model has been difficult to adapt to the development of enterprises,especially in state-owned enterprises,many enterprises began to seek innovative management model,new ways and methods.This article has a in-depth study for HEC based on the matrix project management model,reviewed the development process of HEC project management model,for HEC project management status and problems of induction,summary and analysis,basis of the targeted solutions and Suggestions are given.Firstly,this article has a studies for the background and significance,Then it introduced the difficulties and challenges of the development of state-owned enterprises in China,which has the research and comments on the current project management model and state-owned enterprise project management model.On this basis,which points out the importance of researching the state-owned enterprise project management model,At the same time,it points out the necessity of solving the problems in the state-owned enterprise project management mode.And then elaborates the research target.The article expatiates on the basic situation and the development course of the project management of Harbin Electric Machinery Co.,Ltd,mainly analyzes the present situation of the project management mode,the internal and external environment,points out the necessity of improving the project management mode and impro ving the management efficiency.The reason and necessity of the matrix project management mode are expatiated.This article focuses on the development of organizational structure reengineering,project team building,project cost management,project incentive mechanism establishment,and project risk management under the matrix project management mode.Finally,in order to evaluate and test the implementation of the matrix management model,this article demonstrates the practical application of the matrix project management mode in Harbin Electric Machinery Co.,Ltd,through the case of Fengman hydro power plant rebuilding project,which has shown the actual application of matrix project model in HEC.And puts forward five measures to ensure the construction of matrix project management mode.In this article,the matrix of project management mode,which has a reference value for transformation and upgrading,deepen repform,promote management of Harbin Electric Machinery Co.,Ltd.Meanwhile,it is hope that this article could provide a solution and method to achieve keep going in difficulty,recreate to first class for Harbin Electric Machinery Co.,Ltd,hop e which could provide more reference for the state-owned large and middle sized enterprises about implementation matrix management.
Keywords/Search Tags:state-owned enterprises, project management model, matrix project management model
PDF Full Text Request
Related items