Font Size: a A A

Research On Investment Decision Optimization Of Changchun Thermo Electron Corporation Unit Transformation Project

Posted on:2018-06-10Degree:MasterType:Thesis
Country:ChinaCandidate:D P ZhangFull Text:PDF
GTID:2359330542453649Subject:Engineering
Abstract/Summary:PDF Full Text Request
The power to the development of national economy.Based on this principle of national policy,the electric power as the foundation of the national economy,the electric power system terminal user volume rising,the traditional unique internal information system processing function efficiency,the actual use has been unable to better meet the demands of modern electric power energy terminal customers.By using the current domestic existing thermal energy reserves the object,combined with the status quo of reserve capacity and the development of energy industry in the economic circulation,re engineered steam extraction condensing steam turbine power generation equipment,improve the power generation,heating capacity has become one of the important stage of cogeneration unit project.The unit of power equipment project after the transformation,besides can effectively enhance the generation and supply of energy efficiency in a short period of time,but also can satisfy the customer terminal better use,in the thermal energy transmission unit remote power heating and low energy consumption,high power composite energy supply demands.Compared to traditional device application of power unit the new unit,energy transmission equipment research and development,to better efficiency in different degrees of thermal energy development promotion enterprise transportation.Through energy efficiency of the whole unit equipment in terms of energy consumption,improve economic returns in the amount of energy transmission enterprises at the same time,a better man Policy requirements for environmental protection in adequate countriesThe Heilongjiang province Harbin turbo machinery factory and Shanghai steam turbine factory as a case study of practice,we can make a detailed analysis and Research on the application of Changchun cogeneration steam turbine group.Through the installation of CC50-8.82/0.980/0.type double cylinder type,the unit energy transfer pressure value increased to above the height of Ershisiqian parameters Patrick.The fluctuation range of energy return constant pressure control within the range of the parameters of 0.168 MPa,the better the possibility of condenser overload protection.This paper mainly studies:(1)the status of social background and operation technology introduced Thermoelectric equipment engineering company.And introduces the purpose and significance of the optimization work around at the same time,make a detail optimization selection.And around the unit device project general overview and feasibility of the project research on Optimization of the basic theory.(2)from the analysis of the international market demand for thermoelectric cogeneration projects,the basic content analysis of series thermoelectric Cogeneration Equipment Market Analysis and decision optimization is feasible.(3)from the cogeneration industrial process,the transformation method of unit equipment,by using various help Cogeneration Equipment Optimization and transformation equipment,realize and safeguard all the modern unit equipment reconstruction technology analysis of cogeneration feasibility of improvement in the construction stage of the project decision-making unit.(4)effects from environmental pollution engineering project,project human resources capacity,configuration and project construction organization,project implementation progress of Cogeneration Equipment Renovation decision optimization feasibility.(5)the cogeneration unit project cost investment amount,the transformation of financing plan set,set the assessment of financial statements,the project risk evaluation analysis,further analysis of Cogeneration Equipment Renovation decision optimization feasibility.yyyCogeneration units of equipment engineering project in our country about the thermal environment,energy conservation and emission reduction policy.On the one hand to reduce emissions,reduce environmental pollution;on the other hand can save coal-fired cogeneration units,thermal efficiency has been improved,can not only alleviate the problem of air pollution from the source,but also can effectively reduce the air pollution index of natural city the environment in different extent,help and guarantee the production quality enhance human living environment.In the city area living environment has been optimized in different degrees after the economic benefits of energy transportation enterprises and social development environment,will also get the optimization and improvement of different degree.The whole optimization project investment and economic circulation cycle,will be in control about five years in general,reconstruction of short duration,high rate of return,capital recovery time is short,the inherent characteristics of the decision of reforming unit One of.
Keywords/Search Tags:project investment decision-making, optimization, engineering, equipment
PDF Full Text Request
Related items