Research On Quality Management Of Public Rental Housing Project

Posted on:2018-01-13Degree:MasterType:Thesis
Country:ChinaCandidate:B Z HuFull Text:PDF
GTID:2359330542478110Subject:Engineering
Abstract/Summary:
Public rental housing is a Huimin engineering government,is the government in order to give the low-income population to solve the housing problem,providing housing security and the construction of welfare housing,is an important policy of the government of the people’s livelihood project construction and measures.However,there are many problems in the quality management of public rental housing projects.This paper intends to use the theory of project management and quality management,combined with the construction experience of Chongqing Siyuan public housing project,the quality management of public housing construction projects,in order to provide reference for quality assurance in the construction of public rental housing.First of all,this study through field investigation,mastered the public housing project has been completed "quality management of land,public rental housing has been built on the source of the whole life cycle of project quality management status is analyzed in detail,including the current situation of quality management before the implementation of the project,the status of quality management of project interim status of quality management and project implementation later,through the investigation and analysis,the source of public rental housing has been completed and there are some problems in land project quality management,such as the demand analysis stage,the demand of customer understanding is not in place,there are some defects in the design stage,construction design,project implementation stage did not do a good job of project quality management,project completion phase of the project product protection measures inadequate etc..Next,the influence factors of the source of public rental housing project quality management are analyzed,pointed out the various factors influencing factors of project quality management,including personnel,equipment,materials,methods,environment,and the frequency of influence factors were analyzed.Pass to ensure Siyuan public housing project quality,the source of public rental project of the system of quality management plan,the improvement measures of strategy,determine the early stage of project implementation,the implementation of the mid and late stages of the implementation of the quality management plan,and supervision of the project quality assurance system,developed the early stage of project implementation,quality control measures the implementation of the mid and late implementation of the whole life cycle,to achieve full control and management of project quality supervision,or the relevant units may carry out inspection and supervision for the.Based on the source of public rental project perfect and strict quality control,so that the overall project quality to achieve the best,make public rental project delivery to Siyuan Chongqing Liangjiang New Area public rental housing Cci Capital Ltd,owners of units and public rental housing tenants request.The level of field project is improved and the maintenance difficulty is reduced.When the project is delivered,the qualified rate of the acceptance of the individual project is 100%,and the acceptance rate of the whole project is 99%.The project construction site was rated as a safe and civilized site.Since the project was put into use,the customer satisfaction of the project has reached over 90%.To find out these problems and causes,this paper uses the theory of project quality management,formulate optimization measures of Siyuan public housing project quality management.This paper first defines the project quality objectives,optimize the project quality management organization,secondly,formulate and perfect project quality assurance system,and the implementation of before and after the implementation of the implementation and quality control of the concrete process and practice project detailed measures.
Keywords/Search Tags:public housing project, project quality management, project quality optimization, whole process project management
Related items