Research On Project Schedule Plan And Control Of Steel Scrap Reform Of Video Monitoring System Of Baosteel

Posted on:2016-12-27Degree:MasterType:Thesis
Country:ChinaCandidate:L HeFull Text:PDF
GTID:2381330572964603Subject:Project management
Abstract/Summary:PDF Full Text Request
The article describes the theories of planning and control of project management and takes the steel scrap reform of video monitoring system of Baosteel as an example to apply the methods and tools of project planning and control by making rational planning and controlling the construction,so the project is completed in the end.The construction of monitoring system transformation include awide range of topics and can be affected by many aspects,for example the specific requirements for the time of project in many links.As a result,it is especially important for the scientific scheduled plan and control management in such projects.The main content of this article includes four points as following:(1)The article introduces the early period work of steel scrap video monitoring system of Baosteel and the organizational structure which include the plan objectives,the frame work of the project,the overall structure of the project,the management,the organizational structures and the job duties.(2)we discussed in detail how to apply the schedule planning theory by analysis several schedule planning methods.We adopted computing Critical Path Method Approach for the Project Work Break down Structure(WBS)and the responsibility assignment(LRC),which establish work sequence.We composed the time schedule for the project,the computing diagram,and the critical paths according to computing diagram rules and six-hours-parameters.(3)In regard to some problems which may interfere the timetable of the while project,we further discussed how to control and in the end fulfill the while project by changing some relationships in the work.(4)we made a summary in the end of this article and put forth problems confronted in theory and practice.The article through the steel scrap reform of video monitoring system of Baosteel as an example to apply the methods and tools of project planning and control by making rational planning and controlling the construction,so the project is completed in the end.
Keywords/Search Tags:project construction, project schedule planning, project schedule control
PDF Full Text Request
Related items