Font Size: a A A

Study On Oil Development Business Planning Of Y Oilfield In Thirteen Five

Posted on:2017-06-23Degree:MasterType:Thesis
Country:ChinaCandidate:X Q WuFull Text:PDF
GTID:2381330596469312Subject:Project management
Abstract/Summary:PDF Full Text Request
Y oilfield company production scale to keep for a long time in the top four oil group.As the world changes in the environment,"non-renewable oil and gas is an important strategic materials,but also?commodity?;oil industry faces competition substitutes,visible in the future they will not die;but the oil industry is a high and new technology industry,but profits are no longer " become the basic reflection of the world’s oil industry.Under the international background,combined with China’s national conditions,not to "production scale" as the center,outstanding quality and efficiency,and realize the sustainable healthy development has become the development goals of the enterprise.To formulate a scientific development planning,relationship in the future,eight,think twice before has important practical significance.Through an objective look at internal and external situation in Thirteen Five,locating in Y oilfield faces the downturn,the resources quality becomes poor,technology to break through the bottleneck,decline in operating income,etc.Put forward the original resource,science and technology,people-oriented strategy under high oil price adjustment for the resource,technology,low cost strategy.Analyzed about the present situation of oilfield development,combing the development foundation of company;Inventory oil development potential,the new proved reserves producing potential,has proven reserves unused potential,old potential has carried on the system such as scientific measurement.Analyzed development since the law of the new and old,thin heavy oil,normal and low permeability reservoir reserves producing rate and capacity planning parameters such as contribution,must be cut,form the basis of different planning;Based on the future price of oil,using the method of economic evaluation methods and planning optimization,Implementation planning scheme contrast argument,Based on the future price of oil,using the method of economic evaluation methods and planning optimization,implementation planning scheme contrast argument,the Y oil field oil development,business development plan in Thirteen Five.Cases in enterprise value and enterprise value maximization are the enterprise management and operation development goals,In this paper,we use the: resources potential evaluation,production capacity and reasonable match with the capacity production structure optimization,economic value,rolling fusion evaluation business development planning,etc.Hope it long-term development of oilfield enterprises benefits.
Keywords/Search Tags:Y oilfield, Crude oil development plan, Economic evaluation, Reasonable scale
PDF Full Text Request
Related items