Font Size: a A A

Wind Power Heating Project Operation Mode Optimization And Application Research

Posted on:2018-03-10Degree:MasterType:Thesis
Country:ChinaCandidate:M R ZhaoFull Text:PDF
GTID:2382330518455550Subject:Engineering
Abstract/Summary:PDF Full Text Request
At present,Wind power has developed rapidly in our country,but the question about abandon the wind rationing is more and more serious,cause a lot of clean wind energy resource waste.In heating area,our country is still predominantly consume large amounts of coal resources and that has a low energy efficiency.Wind power heating project,one of the important way to solve the problem of pollution,unable to large-scale promotion in our country.To solve the above problems,this paper studied from three aspects:First,the paper analysis the current situation of the development of wind power heating projects in our country,and put forward the Shared interests wind power heating mode.From the wind heating technology feasibility,current situation of the development of wind power heating project in our country,wind heating policy aspects,analyse the main problems of wind power heating project in our country.Second,on this basis,combining with the operation mode of operation process and the method of payment price,analysis the current wind power heating project benefit,summarizes the advantages and disadvantages of two kinds of operation mode.Integrated the advantages of the two modes,put forward the shared interests wind heating mode.Then,building the efficiency optimization model in Shared interests wind heating mode.Sum up the main factors affecting wind power heating project comprehensive benefits,optimization of the strategy of the relevant settlement price and wind power given strategy,consideration to the wind heating project weights of economic benefit,environmental benefit and social benefit for modeling principles,with the goal of maximizing the comprehensive benefit function,with comprehensive benefits factors affecting range and environmental benefits as the constraint condition,from the global perspective to the efficiency optimization model in Shared interests wind heating mode,completed the change from the qualitative analysis to quantitative analysis.Finally,verify the effective of the model by an example of a project in Inner Mongolia.using the effective set method for the construction of the optimization model of solving,eventually get The results of settlement price mechanism and wind power given strategy.On this basis,according to the electric power system reform and electricity price formation mechanism of related policy,combined with the situation in our country,qualitative analysis the thermal power feed-in tariff,the price of wind power feed-in tariff,heating,and other major risk factors such as wind power subsidies range and sensitivity analysis in the future.The results show that in a Shared interests wind heating mode,the optimization of wind power given strategy and related settlement price can effectively increase the wind power heating project of comprehensive benefits.provide the theoretical basis for the establishment of related policies.
Keywords/Search Tags:Wind Power Heating Project, operation mode, optimization, heuristic algorithm
PDF Full Text Request
Related items