Research On Safety Risk Early Warning Of Inland Piled Wharf's Front Platform Construction Based On BIM

Posted on:2019-12-01Degree:MasterType:Thesis
Country:ChinaCandidate:C DengFull Text:PDF
GTID:2382330545481338Subject:Engineering
Abstract/Summary:PDF Full Text Request
BIM technology has been paid attention and developed by the state during the "12th Five-Year" period.According to the requirements of the relevant government departments of the "13th Five-Year",the technology of BIM will become the trend of the development of the future construction industry.Along with our country "The Belt and Road" and the Yangtze River economic belt construction,port construction ushered in a new climax,BIM technology will be applied to the port construction must be the direction of future development.The problem of construction safety has been one of the most important and difficult problems in the country.The port construction is more difficult than other civil engineering,so it is necessary to evaluate the safety degree of the port and wharf construction.At present,the content of the safety risk management of the whole hydraulic construction is very small,not to mention the use of BIM technology to study the risk assessment and early warning of the port wharf project.So this article takes the front platform of the inner river high pile wharf as the research object,and uses the BIM technology to study the risk assessment and early warning of the construction safety,to achieve a better early warning effect and the development of the practical application of BIM technology.According to the advantages and characteristics of BIM technology,this paper first makes three-dimensional creation of the front platform components and projects of the inner river high pile wharf,and combined with the construction safety risk assessment content,the feasibility and effect of using BIM technology to evaluate and early warning of construction safety risk in the front platform of inland river high pile wharf are tested and analyzed,and the BIM technology can be fast.The speed of engineering information is sorted and analyzed,and it can achieve better risk early warning and risk measure information feedback in 3D engineering models.Then,a plan for construction safety risk assessment and early warning can not be directly used in BIM technology.Combined with BIM technology,the scheme is improved.The evaluation of the early warning target is decomposed into the sub project of the BIM technology phase division,and the calculation of the risk early warning index parameters can make the calculation more scientific and objective,and the detailed system is used to study the risk early warning of each sub project.Based on the BIM,a complete safety risk early-warning body for the construction of the front platform of the inland river high pile code head is established.The Department of.Finally,a complete risk warning system is set up in the actual project of the front platform of the river high pile wharf,which improves the efficiency of the risk assessment and early warning of the construction safety,and shows the risk results more carefully and accurately through the three-dimensional information model,so that the risk degree of the construction safety risk of the various participants is intuitionistic and the risk degree of the project is visualized.A detailed understanding.This paper analyzes the feasibility of applying the BIM technology to the safety risk early warning of engineering construction,and combines the BIM technology to complete the innovation and creation of the early warning system for the construction safety risk of the front platform of the inland river high pile wharf,and verifies the practicability of the BIM technology in the early warning of the construction safety risk combined with the actual engineering,and for the future BIM technology to the inland river high pile code.It provides a reference for risk assessment,early warning and development of construction safety.
Keywords/Search Tags:BIM, piled wharf, safety assessment, risk early warning, practicality
PDF Full Text Request
Related items