Font Size: a A A

Research On Financing Risk Assessmengt System Of China's Contract Energy Management Project

Posted on:2019-08-27Degree:MasterType:Thesis
Country:ChinaCandidate:C Z ZhangFull Text:PDF
GTID:2382330548991739Subject:Accounting
Abstract/Summary:PDF Full Text Request
China's relevant departments released the "12th five-year plan" for industrial energy conservation as early as 2012.The plan is proposed to achieve the total goal of saving energy 6.7 million tons of standard coal.As a new energy saving mechanism based on market operation,contract energy management project is the one of the important contents of developing of energy saving service industry.The contract energy management project is faced with great financing difficulties during the development,due to the particularity of the contract energy management project.In order to provides theoretical guidance and methods for alleviate the problem,this paper taking the GD energy saving renovation project as an example,using the questionnaires and analytic hierarchy process to study the financing risk assessment.The main contents are as follows:(1)Consulting and summarizing the domestic and foreign research results on the financing risks of China's contracted energy management project,and analysing the research status;(2)Elaborating the financing mechanism and financing model of GD energy savingrenovation project.Identifying the financing risks of GD energy saving renovation project.combined with the china carbon market has set up in2017.(3)Using analytic hierarchy process and comprehensive evaluation method to construct the financing risk model of China's contract energy management project.(4)Obtaining the financing risk level of the project through case analysis of the financing risk assessment of the GD energy saving renovation project.Based on this,putting forward some reasonable Suggestions to reduce the financing risk.The conclusions are as follow basing on the result:(1)Structuring an risk assessment system of contract energy management project consists of "operational risk","customer risk","External environmental risk","carbon market risk" and "financial market risk".(2)After a comprehensive evaluation of the financing risk of a GD energy-saving renovation project,it is concluded that the financing risk of the project is "The third-class risk".And then,putting forward the risk prevention measures and suggestions.Considering with their strategies and risk preferences,enterprises can decide whether to invest in this project according to the evaluation results.The research results provides theoretical and methodological references for scientific investment decisions.
Keywords/Search Tags:energy management contract project, funding risk, carbon market, risk assessment system
PDF Full Text Request
Related items