Research On Schedule Managment Of Chemical Cleaning Projuct In Taiyuan Substation

Posted on:2019-05-11Degree:MasterType:Thesis
Country:ChinaCandidate:X J ZhangFull Text:PDF
GTID:2382330551457190Subject:Project management
Abstract/Summary:PDF Full Text Request
Taiyuan substation chemical cleaning project schedule management research based on the modern project management knowledge system framework,combined with the characteristics of the project,with reference to the advanced scientific research experience at home and abroad,systematic analysis of power grid project management process and method.According to the operation and management process of the power grid project,the corresponding analysis and research are carried out from the project plan management,schedule control and other aspects,and then a simple and effective management mode is obtained.In this paper,the whole project operation schedule management is studied and analyzed in detail according to the actual situation of the project,including the live cleaning construction of 220 kv substation and 110 kv substation belonging to the national grid XXX power company.the main work is as follows:First of all,according to the expected progress of the project overall goal,the content of the project,steps,internal contact and construction time to make specific analysis,and according to the actual engineering situation,including personnel,equipment,construction plan,finally according to the preparation plan for construction work.Second,in the process of project implementation,check whether the actual progress is consistent with the expected plan.If there is a deviation in the process of construction,must make analysis in time,at the same time take corresponding measures to remedy,if difficult,to make changes to the plan in time,so that the project completed on schedule.Third,to make reasonable progress control of the project,is based on schedule,mainly shows the content of the construction,each part of the sequence and each part of the time.The expected plans include:annual progress plan,overall progress plan,block plan,etc.,and the above different plans also have different purposes and functions,and this series of plans also constitutes the planning system.Schedule plan plays a very important role in the whole construction process,is an integral part of the whole project.With the rapid and stable development of China's economy,the contradiction between power supply and demand is further increasing.Therefore,the charged water flushing project does not need power outage,cleaning effect is good and many other advantages,for China's power development has made great contributions,at the same time,effectively reduce the power system pollution flashover accident rate,reduce the number of power outage maintenance,to maintain long-term,safe,reliable and stable operation of the power grid has important significance.According to the framework of modern project management knowledge system,according to the chemical cleaning project management system and management mode of Shanxi electric power company,this paper makes a systematic summary and analysis of the completed project,through the combination of theory and practice,finds out the shortcomings and corrects them,and finally establishes a set of convenient operation of power grid construction project schedule management model,which provides a reference for the chemical cleaning project management.
Keywords/Search Tags:schedule management, project management, chemical cleaning, substation, external insulation charged cleaning
PDF Full Text Request
Related items