Font Size: a A A

Study On The Whole Process Management Reasearch Of The Large-scale Non-standard Industrial Equipment Project Of S Company

Posted on:2018-09-27Degree:MasterType:Thesis
Country:ChinaCandidate:X B TaoFull Text:PDF
GTID:2382330566498973Subject:Project management
Abstract/Summary:PDF Full Text Request
The new generration of large launch vehi cle is for improving the overall level and capacity of the rocket which has a lot of charateristics as non-toxic?non-pollution?high-performance?more diffcult an so on,it is on behalf of the highest levels of science and technology innovation of the rocket.The large non-standard processing equipment has the characterstics as more concerning subjects ? single piece development ? multi-specialties ? long and tedious development and production process.As economic globalization has led to increasingly fierce market competition,project management requirements are also increasingly higher.A successful completion must ensure quality?cycle and cost.Due to the features of special purpose?custom-tailor?small-lot and so on,how to efficiently achieve the project management becomes the centre of attention of more and more companies.This article based on the demand side of Aerospace Enterprises,combine with the inherent characteristics,the development requirements and difficulties,of large scale non-standard equipment for Aerospace,to sort out existing large non-standard process equipment development management model and its problems.Through the analysis,combine with the whole process management theory,resetting the whole process management plan,defining the target of project optimization management.Different management stage are divided according to different work priorities.The whole process management plan made by according to the stage and specialties.And on this basis,a series of safeguards are formulated.Through standardizing the plan?the task management?the cost management?the standard management and the management interface connection,the key link of project development is controlled.In order to explore a set of suitable development management plan for large scale non-standard equipment of clear flow?definite responsibilities and standard unification.As the same time it has a very good reference to other enterprises.
Keywords/Search Tags:aerospace, the non-standard equipment, the whole process management
PDF Full Text Request
Related items