Font Size: a A A

Analysis And Optimization Design Of Keyouqianqi Factors Affecting The Reliability Of Rural Power Supply

Posted on:2019-11-08Degree:MasterType:Thesis
Country:ChinaCandidate:Y Y YuFull Text:PDF
GTID:2382330566959217Subject:Engineering
Abstract/Summary:PDF Full Text Request
With the continuous development and improvement of the national Power Grid Corp's UHV construction,electricity has become the economic lifeline of the country.The demand for electricity is increasing in modern society,which requires continuous power supply.On this basis,the power users are increasing the reliability and safety of the power supply.In order to improve the reliability and power quality of the power supply,the power supply enterprises have been exploring and constantly improving the corresponding technical means to meet the actual needs of the power users.The area of Keyouqianqi right front banner belongs to the poor and backward region of the state,and the basic investment of electric power construction is also increasing and advancing.The structure of the power line grid is still weak.This requires that we should explore the corresponding means in accordance with the local area on the basis of limited funds to improve the local supply.Electrical reliability in order to promote economic development.In order to improve the reliability of the power supply in the region,this paper analyzes the network frame structure,power supply mode and the operation situation in recent years,and analyzes various factors of power supply reliability in the right front banner area according to the existing data.Through the introduction of the existing analysis method of power supply reliability,combined with the characteristics of the single circuit radii,the long power supply radius and the less old load of the line,the analysis method used in this area is to consider only the single back radial line of the agricultural network,and the assessment of the supply of the right front banner area of the section.The level of electrical reliability.In addition,combined with the existing regulations and targets of the national Power Grid Corp,the management innovation plan and management mechanism should be formulated and applied to the actual work.According to the analysis,the improved relay protection setting scheme and the installation of line switches are targeted for transformation and implementation.After the actual operation of the project,using the statistical analysis of a period of time,the power supply reliability of the reformed part of the line power supply area is obviously improved,which proves that it has practical application value in the local area.
Keywords/Search Tags:Power supply reliability, Distribution network, Keyouqianqi electric power supply company, Improve measure, Relay protection
PDF Full Text Request
Related items