| With the rapid development of China’s economy,new requirements have been put forward for urban construction.As an important infrastructure of civil aviation transportation and cities,airports have produced a wide range of social and economic benefits.China’s civil aviation industry has entered a period of rapid growth.The construction of airports has developed rapidly,and the major cities in China have also promoted the upsurge of new construction and expansion of airport terminal areas.Dalian Zhoushuizi International Airport(hereinafter referred to as Dalian Airport)as an important functional area of Dalian,is also the main hub of future external transportation,and plays an important role in the development of the city.From the point of view of policy,economy and planning,the air traffic of Dalian Airport will continue to grow.Considering the main problem that restricts the development of the airport at present,before the new airport is put into operation,the existing facilities of the old airport need sufficient capacity to ensure future passenger growth.Through the capacity of the flight area Quantity,terminal capacity and corresponding supporting facilities are analyzed.The current situation of the airport is that the carrying capacity has become saturated,and some facilities of the terminal can not meet the future development needs.Therefore,it is urgent to rebuild and expand the terminal area to meet the security and service level of the airport during the transitional period.There are five main parts in this paper.The first part analyses the current situation of airport development in China,clarifies the background of this study,relevant research at home and abroad and the definition of related concepts;the second part briefly discusses the basic characteristics,process flow and functional composition of airport terminal building,and summarizes the design points of terminal building process;the third part summarizes the design points of airport terminal building process.The volume of air traffic is forecasted as a whole,and the scale of main functional areas and the number of facilities are simulated and analyzed.The fourth part lists the relevant cases of Dalian Airport in recent years from the aspects of function,process,selection,and so on.The fifth part puts forward the implementation of the existing terminal reconstruction and expansion.Case and countermeasure.Through the preliminary discussion and optimization of the airport terminalarea reconstruction and expansion,it can provide technical reference for the airport similar project reconstruction and expansion in the future. |