Study On Progress Management Of Digital Transformer Substation A Project In Macao

Posted on:2019-02-20Degree:MasterType:Thesis
Country:ChinaCandidate:L JinFull Text:PDF
GTID:2382330596962718Subject:Engineering
Abstract/Summary:PDF Full Text Request
With the rapid development of science and the increasingly fierce market competition environment,project management has developed rapidly and gradually evolved into high-end,technical management methods.At present,project management is becoming more and more complex and the maturity of theory is getting higher and higher.In Macau,due to the complexity of substation construction projects and the high uncertainty of the environment,the shortage of resources,the overdue project schedule and the cost exceeding expectations have generally occurred in substation project construction,which makes the project schedule management particularly important.Electric power construction projects are resource-intensive,technology-intensive and capital-intensive projects,subject to the construction site conditions,time limit,equipment transportation and procurement,equipment manufacturing and engineering design and other factors,so the project management is very important.From the point of view of project implementation,it is necessary to use reasonable and scientific techniques and methods to compile a scientific management system.In order to successfully complete the entire project,it is very important to make the schedule of the project magnagement as soon as possible,and take the full advantage of the related resources in the project in a limited time.In the substation project,the process involved is more complex,there are many sequential requirements between the processes,there are also many professional cross-operation work at the same time.For example,the relevant equipment must be installed before the cable terminalation and the relevant test has been completed.Otherwise,rework and redo will occur.Generally,the prominent problem in the project management of newly-built substations is that the project management schedule is not scientific,resulting in the late schedule can not be implemented.In view of this problem,it is urgent to carry out strict control and supervision,scientific analysis and Research on the project schedule of some new substation projects.Only in this way the project could meet the expectations and promote the final completion of the project.In this paper,the project progress of the installation and commissioning of A digital substation in Macao is studied.According to the actual background of the project in Macao and the resources of all aspects of the construction party,the process time schedule is established.Within the premise of considering the resource constraints,the key procedure of identifying the project progress and the situation that can affect the progress are analyzed.Therefore,the project schedule plan of the substation is determined,and the project schedule is dynamically adjusted in the actual promotion of the project,so that the progress of the project is effective.It will also enlighten and instruct the construction of other transformer substation projects in Macao.
Keywords/Search Tags:Crirtical Chain, Progress Management, Digital Transformer Substation
PDF Full Text Request
Related items