| Engineering quality as the core target of engineering construction,but also with the continuous development of science and technology and the fierce competition in construction market,construction project in our country is faced with significant improvement of quality problem.For now,the construction of our country enterprise efficiency and economic benefit is in a state of stagnation,compared with some developed countries,the engineering is widespread in the construction of long working hours,low efficiency,large consumption,high cost,poor quality,and so on.PuHe throughout as something of a big river in the north new district,shen territory planning length 33.2 km,for the shenyang city pipe large rivers.PuHe status also without comprehensive control,narrow and deep channel and the flood control capacity is low,flows through the flood will run in the now,is not the development and utilization of water resources,thereby limiting the development of the economy.According to the overall plan and the requirement of ecological city in the north new district shen,pu river system renovation project governance mainly river for PuHe moral section,pu river system construction into integrating flood control and drainage,ecological landscape city water system.The content of this research is based on the quality of PuHe river renovation project of the PDCA management cycle,quality management cycle system was studied mainly.Through the background,significance of project quality management and quality management of the basic theory of overview,we to the project quality management have a certain understanding,on this basis,combined with the actual,make full use of PDCA cycle in the process of quality management in construction engineering project construction control for empirical research on construction project.Because of project quality management is out of control will affect the final quality of the project,and the quality is the key to a project success or failure,in the construction project quality management is the most direct impact on the whole project quality.Regardless of any project,the project quality determines the project can realize great role,the project can produce far-reaching significance,project indicators can reach and so on.To sum up,the importance of the quality of the project is first and foremost,based on the PuHe river renovation project as the research object,using the theory of PDCA cycle,to ensure the quality of the project,to reduce the fault of project and construction period.In this paper,according to the actual circumstances of the PuHe river renovation project,analysis how to improve the quality of the PuHe river renovation project,using PDCA management cycle quality of PuHe river project afforestation construction go-between,machine,material,method and so on concrete quality control to ensure the smooth implementation of project quality objectives,to improve construction project in our country in building project quality management system of the necessity and the importance of PDCA,make our country construction project more standardized,scientific and reasonable,thus further strengthening our country construction project quality,and promote faster development of our country’s construction project. |