Font Size: a A A

Research On Risk Management Of Qingdao Oceantec Valley A Village Reconstruction Project

Posted on:2020-06-28Degree:MasterType:Thesis
Country:ChinaCandidate:X X LiuFull Text:PDF
GTID:2392330590485352Subject:Project management
Abstract/Summary:PDF Full Text Request
In recent years,with the continuous development of urbanization,the scope of urban land continues to expand,and the villages in the neighboring cities are surrounded by the expanding urban planning.Because the urban villages themselves have problems such as old infrastructure,backward economic development and poor living environment,which seriously affect the urban development and are not conducive to people’s living and working in peace and contentment,the reconstruction of urban villages is imperative.However,the urban village reconstruction project is a huge and complex project for people’s livelihood.There are multiple interests involved in the reconstruction process,and many risks are faced at each stage.If the project risk identification,evaluation,prevention and control are not done well,it is likely to cause delay or stagnation of the project,or even great losses.Qingdao Oceantec Valley A village renovation project involving government,enterprises,villagers,and many other subjects,contains the house moved,project construction and project acceptance and so on multiple stages,need A lot of money and multi-sectoral coordination,the construction personnel,construction equipment,site,etc.There are strict requirements for the numerous factors that affect the project schedule and target to complete,therefore,risk management is of vital importance in the Qingdao Oceantec Valley A village renovation project smooth implementation.In this paper,the project risk management theory,Qingdao Oceantec Valley A village reconstruction project for in-depth study.First,through literature review,the risk management research of village reconstruction at home and abroad is summarized,the relevant theories of risk,project management and risk management are introduced,and the contents and methods of risk identification,risk evaluation,risk prevention and risk monitoring are elaborated.Second,analysis of Qingdao Oceantec Valley A village renovation project basic situation,the present situation and existing problems,and through field visiting survey and questionnaire to collect data and data analysis,by using Delphi method,field survey method and causal analysis method through consulting relevant literature and consulting relevant experts such as identification,identify the policy risk removed,housing tax risk,financing risk,internal risk decision-making andrisk management,construction management and project acceptance of the 6 main risk factors and 18 specific risk factors.Third,build the risk evaluation index system by using expert scoring method and analytic hierarchy process to determine the indicators relative to the weight value,the influence of the whole project in the end it is concluded that financing risk and construction management risk degree is relative bigger,financing scheme had the greatest influence in all risk factors.In the process of project operation should focus on prevention;Combined with the data obtained by the analytic hierarchy process,the fuzzy comprehensive evaluation method is used to judge that the risk level of this project belongs to medium risk.Fourth,according to the results of risk identification and risk assessment,comprehensive and detailed prevention and solution measures or emergency treatment plans should be developed to further reduce the project risks,and minimize the risks that may be caused by the implementation of the project and ensure the smooth completion of the project objectives.In addition,the research ideas and methods of this paper can also provide certain reference for other urban village reconstruction projects and help improve the project risk management level.
Keywords/Search Tags:Urban village renovation project, Risk identification, Risk assessment, Risk control
PDF Full Text Request
Related items