Study On The Whole Process Project Cost Control Of BK Manor Housing Project

Posted on:2020-09-05Degree:MasterType:Thesis
Country:ChinaCandidate:H T ZhangFull Text:PDF
GTID:2392330590959558Subject:Project management
Abstract/Summary:PDF Full Text Request
China began to accelerate the process of urbanization in the 1980s and 1990s?and at the same time brought the demand for improvement of living conditions,which led to the establishment of a large number of new communities.However,with the continuous and strict adjustment of national macro policies,the const.ruction industry is now facing unprecedented new challenges,the risk of the construction industry market is further intensified,and the competition between enterprises is increasingly fierce.Under the guidance of national policies,the market of con,struction industry gradually moves towards standardization and maturity,and the idea of paying attention to management and improving the market viability of enteirprises begins to become the mainstream.Qne of the best ways to reduce construction cost and increase project benefit level is to implement strict and reasonable cost control.The whole-process cost control mode is a scheme to control the cost of the whole cycle of a project.It starts fr-om the feasibility study stage and goes through the comparison and selection of various schemes,preliminary stage design.,construction drawing stage design,construction bidding and implementation,until the completion and acceptance.This mode is usually implemented by specific departments in the implementation process,so as to avoid multiple management and clear guarantee responsibilities,and ensure the smooth completion of the cost control work of the whole project.According to the characteristics and problems faced by the construction project of BK residential area,tthis paper constructed the whole-process cost control system of the project;and explained in detail in eac.h stage of the project construction from the perspective of cost control and corresponding specific measures.In order to achieve the project cost control in appropriate range,reduce construction costs increase the risk of the overall objectives,such as preparation of construction cost control in the process of order,by the method of value engineering to construction design scheme selection,in the stage of the approved price,engineering settlement control in such aspects as bidding links exist various risks that may arise during the process of project implementation deviation control.At the same time,the possible unknown conditions at each stage were effectively controlled and dealt with,the control objectives of project cost were reasonably formulated,and finally the cost management procedures in the process of project implementation were gradually standardized.In another aspect,it also describes that the whole process cost control system is very important in saving and optimizing all kinds of resources of the project and implementing the final cost control goal.In this paper,through the use and application of the whole-process cost control model in BK community construction project,as well as the analysis and summary of the specific application and the final effect of this model,it is expected that this model can play some demonstration and reference role for similar construction projects in the field of engineering cost.
Keywords/Search Tags:Whole process cost control, Constriction industry, Construction stage
PDF Full Text Request
Related items