Font Size: a A A

Study On Construction Quality Management Of Landscape Engineering In Changzhou Yulan Square

Posted on:2020-04-22Degree:MasterType:Thesis
Country:ChinaCandidate:Q D TangFull Text:PDF
GTID:2392330596476980Subject:Project management
Abstract/Summary:PDF Full Text Request
Landscape as an important part of real estate projects,with the increasingly fierce competition among real estate enterprises in China,consumers have higher and higher requirements for the quality of real estate products,landscape gets more and more attention in real estate projects.Since the real estate industry in our country uses the period room booking system,that is to say,when home buyers buy a house,the developers will promise delivery time.Landscape construction is the end of the whole project construction process,the process before landscape construction includes civil engineering,municipal,decoration and so on.These front links often delay construction schedule because of a variety of reasons,As a result,it will short the construction time for the landscape.On the other hand,in order to sell the houses on time and reduce the buyers' complaint,developer often requires the construction unit in the shortest possible time to maximize the design effect,which makes the schedule time more tighter.Therefore,the quality management of the landscape construction becomes particularly important.This thesis is based on the situation of Changzhou Yulan square construction quality management,in order to study the control process of landscape construction quality.Firstly,clarify basic concept and key points of landscape quality control should be clarified to establish the foundation and clear direction for the research on landscape quality control.Secondly,the main problems in the construction stage of landscape engineering are sorted out.On the basis of theoretical research,the idea of fine management is applied to clear the responsibility of construction quality to the individual and form a complete landscape quality control system.At the same time,the experience accumulated in the practice of PDCA cycle method is used to further modify and adjust the theoretical system,so as to improve the theoretical system and continuously improve the construction quality control ability.Finally,the construction quality management of Changzhou Yulan square landscape project is carried out,and the construction quality control methods of landscape project are applied in practice,and its maneuverability and effectiveness are verified.Through the above research,the landscape construction quality control system with strong operability and practical significance has been formed,which has certain reference significance for enterprises to accumulate construction experience and improve management level.
Keywords/Search Tags:Landscape engineering, Quality control, Delicacy management, PDCA cycle
PDF Full Text Request
Related items