Study On Construction Cost Control Of Airport Air Traffic Control Project

Posted on:2021-01-13Degree:MasterType:Thesis
Country:ChinaCandidate:C DengFull Text:PDF
GTID:2392330602978927Subject:Project management
Abstract/Summary:PDF Full Text Request
With the vigorous development of China's civil aviation transport industry,China will build,renovate and expand many airports.Many construction enterprises are aiming at this field and hope to make profits.However,the civil aviation engineering industry's high access conditions,high quality requirements,high technology requirements and other factors restrict the relevant construction enterprises' own competitiveness.Therefore,it is of great significance to study how to control the cost in the process of project construction to enhance the competitiveness of enterprises.Paper to airport atc engineering project cost control as the research object,in the airport air traffic in China to analyze the actual construction of the project research,found that at present our country each district traffic control in the process of construction project is over budget approval would happen frequently,through to the H airport ate project prophase construction situation carries on the analysis and research,found time lag,the early stage of the project with the different problems such as cost overruns,according to the actual situation of project,this paper puts forward that using the earned value method for cost and schedule control,and the actual situation of H project combined with theoretical method for the design,Collect all elements of earned value and summarize them.Analyze the data to find out the actual problems in the project and correct the deviations in time.The application of earned value method in the whole process can effectively control the cost and progress of the whole project in the middle and later stages,and at the same time,it can find out the place and reason of the deviation in time.Through the practical application of this project,it can be found that the methods of reasonably arranging construction time,reducing the cost of labor,materials and machinery,doing a good job in project management and coordination,and strengthening the inspection of daily work of relevant metrology personnel can effectively improve the actual construction situation of airport air traffic control engineering projects.Paper features,earned value method in the actual project progress and project cost,combined with the use,and throughout the entire project construction process,to the actual project as the research object,has solved the previous cost and schedule separate research train of thought,a combination of both,make project management personnel in the actual management process that can be both.
Keywords/Search Tags:Airport air traffic control engineering projects, Cost control, Earned value method
PDF Full Text Request
Related items