Font Size: a A A

Research On Risk Management In The Construction Of A International Airport Foreign Object Debris Detection System

Posted on:2021-03-04Degree:MasterType:Thesis
Country:ChinaCandidate:S MeiFull Text:PDF
GTID:2392330611450915Subject:Project management
Abstract/Summary:PDF Full Text Request
Since the beginning of the new century,with the continuous growth of the national economy,the civil aviation transportation industry has made great progress.With the improvement in airport management level and the gradual maturity of security technology,there are new requirements for aircraft safety.Against the background of the rapid growth of civil aviation business,how to ensure the operational safety of aircraft and improve the safety level of public travel is a huge challenge to the development of Chinese civil aviation industry.The runway foreign detection system has become the main means of airport runway alien detection.With the development of the application of the runway alien detection system,the risk management of the runway alien detection system in the construction process has become the key factor for the successful completion of the project.This article takes A International Airport Foreign Object Debris detection system as the research object to study the risk management of the Foreign Object Debris detection system project implementation process.Firstly,the influence of runway extraneous material on aircraft safety is introduced,and the necessity of runway extraneous material detection system is analyzed.Secondly,on the basis of risk identification of combining the runway foreign substance on the risk identification process detection system project risk identification,the main economic risk,technology risk,construction risk,management risk and time limit for a project risk,the combination of qualitative and quantitative ways made the standard of risk assessment,according to the risk assessment of the standard to evaluate project runway foreign substance detection system,it put forward project risk assessment for the coordinate diagram,and the risk area coordinated area is divided into high,medium and low risk.Finally,based on the results of risk assessment,the corresponding risk response measures and safeguard measures for the implementation of the runway alien detection system project were formulated for high risk,medium risk and low risk factors and combined with the actual situation of the project.According to the level of risk and risk identification results put forward measures to deal with risks,effectively avoid the Foreign Object Debris detection system risk and control risk occur,thereby causing loss to the project to ensure A international airport ran to the Foreign Object Debris detection system smooth construction of the project,as Chinese first Foreign Object Debris detection system of airport runways,for our country foreign agent detection system in the future of the national airport runway extension provides in the process of risk identification and management in the theory and case reference.
Keywords/Search Tags:risk identification, risk assessment, risk management, risk response, foreign object debris, foreign object debris detection, system construction
PDF Full Text Request
Related items