Font Size: a A A

The Research On Cost Control Of Intelligent System Integration Project In Office Building

Posted on:2020-10-06Degree:MasterType:Thesis
Country:ChinaCandidate:W W ZhangFull Text:PDF
GTID:2392330611954937Subject:Project management
Abstract/Summary:PDF Full Text Request
Building intelligence industry has huge market potential,so more and more enterprises enter the building intelligence industry.At the same time,the owner put forward higher requirements for the intelligent building system,the owner side is also more professional,the price of the building intelligent system integration project is constantly reduced,and gradually close to the cost.The quality of the intelligent integrated construction enterprises in China is uneven,the overall management level of small and medium-sized enterprises is not high,the traditional cost management is inefficient,the attention is paid to post-event control,the consciousness and level of cost management is low,and the standardized management can not be realized.How to improve the level of cost management and how to strengthen the science and effectiveness of cost management in intelligent construction enterprises are The key problems facing the development of enterprises.In this paper,the composition of the intelligent integrated project system of office building,the characteristics of the intelligent system integrated project cost management of the office building,combined with the content of the intelligent system integrated project cost management and the characteristics of the cost management,The intelligent system integrated project cost management system of office building is constructed.The basic organizational framework of office building intelligent system integration project cost management and the basic process of system integration project total cost management are determined.In the operation of the intelligent system integrated project cost management system of office building,we should follow the principles of people-oriented,all-staff participation,clear objectives,process control and system control,goal management and the combination of rights,responsibilities and benefits.The basic work contents and methods of cost management,such as cost estimation,cost planning,dynamic cost control and cost accounting,cost analysis and so on,are determined.Combined with the case of intelligent system integration project cost management in an office building,this paper finds out that the cost management of the intelligent system integration projectof an office building is in the stages of setting cost target,deepening project design,project construction process and project completion.There are cost control problems in the whole process of the project.Therefore,it is necessary to improve the rewards and punishments of project management.System,improve the project manager as the core of the cost control organization management system;Carry out the principle of combining responsibility,power and profit,strengthen the control of labor,machinery and material costs in the construction process,and strengthen the cost accounting and analysis of the project.
Keywords/Search Tags:office building intelligence, system integration project, cost management, cost accounting
PDF Full Text Request
Related items