| In recent years,despite the continued development of the construction industry,overtime in engineering projects is widespread.Due to the uncertainty of the construction process,all the factors that affect the schedule will eventually lead to the delay of the project schedule,delay the construction period,and predict the factors that affect the progress of the project before the start of the project,and the countermeasures of related factors.The technology can quickly change this problem,and there are new construction schedules and arrangements to quickly and timely split the total amount of engineering required to meet the new schedule requirements,or to quickly calculate people,Material,machinery requirements to meet the requirements of the new construction period,in order to achieve project progress control,to ensure that the project can be completed in a high quality and on schedule.However,the rapid development of BIM technology now provides ideas and technical methods for researching more scientific and effective engineering project progress control methods.Based on the traditional schedule management method,this study combines the original advantages of BIM technology and the traditional schedule management technology of engineering projects to construct a construction schedule control method based on BIM technology.The main work completed in this study is as follows:First,collect and read relevant domestic and foreign literature,and on this basis,summarize and summarize the relevant experience of traditional engineering project construction control,based on the new BIM construction technology,and comprehensive analysis of traditional engineering projects and technologies based on BIM The implementation progress monitoring summarizes the shortcomings and advantages of two methods for managing project progress: based on the above research basis and the actual situation in the process of the project,the research content,research direction and technical route of this paper are derived.Secondly,the theories and methods of traditional construction progress control are introduced,and the relationship between them and the changes and value brought by the introduction of BIM technology are discussed.In the project’s schedule control system,it isclear that BIM technology is a tool for optimizing schedule control,while traditional schedule management is still an important tool and method,which can jointly improve and improve the schedule control system and achieve schedule goals.Third,introduce the current status of project schedule control,introduce and analyze the problems and deficiencies of current project schedule control,and analyze the problems of project schedule control in China.Find out the main factors that affect schedule control,and put forward some countermeasures for influencing factors in traditional schedule control.Improve and improve the factors that are easier to control.For the more difficult factors,use the new technology-the introduction of BIM technology to further Improve and improve.Fourth,combining the advantages of BIM technology and the theory of construction progress control of the project,the construction of the construction progress control process of the construction project based on BIM technology has been completed.At the same time,the influencing factors affecting the progress control of traditional engineering projects have been identified.Means the construction progress control system of the project,and discusses the main steps and implementation points of the related progress control influencing factors.Fifth,through the research results combined with specific engineering cases,through the study of the application of the research results of the project construction progress research based on BIM technology,the conclusion is drawn on the basis of comparative analysis,and the construction progress of engineering projects based on BIM technology Control is effective.Sixth,the research conclusions of this paper are summarized.Four conclusions are obtained: the construction schedule control process based on BIM technology is more detailed and advanced;the influencing factors of construction schedule control based on BIM technology are more clear.BIM technology is used to control the construction progress of the project,and the factors affecting the work progress are solved in advance so that the construction progress of the project can be better controlled.Finally,it analyzes some deficiencies in the research of this paper,and puts forward the prospect of in-depth research on schedule control. |