Font Size: a A A

Research On BOM System Construction Under Mass Customization

Posted on:2021-04-19Degree:MasterType:Thesis
Country:ChinaCandidate:L ZhouFull Text:PDF
GTID:2392330614466136Subject:Project management
Abstract/Summary:PDF Full Text Request
With the global economic integration,Internet technology and the vigorous development of e-commerce,customers’ requirements for individualization have become higher and higher;the competition between enterprises has not only been the competition of traditional methods such as price and technology,but has transformed into Competition for time and individual needs.Providing customized and personalized products to customers and improving customer satisfaction has become the current trend of corporate competition.Based on this historical background,mass customized production has emerged.Mass customization puts forward new requirements for enterprises,and enterprises need to carry out corresponding business changes to adapt to this change,and the BOM management that runs through the entire enterprise business chain also needs corresponding changes to support the reform of this business process system.This paper combines the status of BOM management of S company and the new requirements under mass customization conditions and the current implementation of BOM system construction projects,and analyzes the methods of BOM system construction under mass customization conditions,implementation applications and implementation of BOM system belts The results.This article analyzes in detail how to organize BOM under the conditions of mass customization,how to open up planning,R&D,sales,and production through integrated configuration management;how to realize the integrated BOM management of the entire business chain,and how to support from the planning stage to Product development,process manufacturing,production logistics,after-sales service production creation process and planning,sales and orders,order and scheduling order delivery process and enterprise-levelchange management,establish an end-to-end change framework,Ensure the tight coupling between the change order and the changed data,and ensure the accuracy and timeliness of the data.The construction of the BOM system is not only an IT information system project,but also requires the construction of corresponding business processes and systems to be truly completed.Therefore,this article also analyzes how to improve business processes during the construction of the BOM system,including organizational structure Adjustment and definition of division of responsibilities,business process and specification definition,BOM data sorting verification and migration,etc.,so as to ensure that the construction of the BOM system can be truly implemented.Through the construction of the BOM system and the implementation and application of the BOM system,company S has greatly improved the work efficiency of the enterprise,which is mainly reflected in the following aspects: through the adjustment of the BOM structure,the BOM management method of a single vehicle model is transformed into a super configurable BOM management method,To reduce the amount of BOM maintenance by more than 60%;in addition,through the realization of integrated BOM management,the business areas of planning,R&D,sales,and production are opened up,avoiding repeated maintenance and conversion of information between various business areas,reducing workload and enabling mass production The accuracy of the BOM data at the stage is basically 100%;through the realization of integrated configuration management,engineering,production,and sales are opened up,which can support customized orders for users,and can directly convert the configuration information of the order into the materials required by the order Information can support guided sales,personalized customer needs,and quickly respond to market requirements;through the implementation of integrated change management,the change content is tightly coupled with the change order to ensure that the change review content is actually the actual data after the change,avoiding the change order The two-layer skin with the changed content ensures the correctnessof the data and greatly reduces the time for the conversion of the changed content.
Keywords/Search Tags:Mass Customization, BOM Management, Configuration Management, Change Management
PDF Full Text Request
Related items