Study On Elimination Auxiliary System Of 10kV Distribution Network Ring Main Unit

Posted on:2021-01-15Degree:MasterType:Thesis
Country:ChinaCandidate:C HuFull Text:PDF
GTID:2392330647454431Subject:Electrical engineering
Abstract/Summary:PDF Full Text Request
With the rapid economic development of the Honggutan New Area in Nanchang,the demand for electricity has risen sharply,the construction of the power grid has developed rapidly at the same time,and the load rate has continued to increase.The number of ring main unit,switching stations,cable branch boxes and other equipment has also increased rapidly.The opening and closing station and other equipment are located inside,and the wind and sun are prone to defects,which causes the distribution network transportation inspection experts to reduce the number of equipment continuously,and the work pressure of the transportation inspection professionals increases.The opening and closing station and other equipment are located inside,and the wind and sun are prone to defects,which causes the distribution network transportation inspection staff to reduce the number of equipment continuously,and the work pressure of the transportation inspection staff increases.To effectively improve the operation and maintenance level of the distribution network needs to shorten the time of elimination,and reduce the waste of time caused by problems such as unfamiliar road conditions,clarifying specific locations before departure,road conditions,and finding drawings.Therefore,in this paper,combined with the actual work of the Nanchang Honggutan New Area Power Supply Company,the design and implementation of the 10 k V distribution network ring network cabinet elimination auxiliary system are studied.First,conduct theoretical analysis and research on the overall design plan of the 10 k V distribution network ring main unit elimination auxiliary system,compare and analyze each plan,and determine the system model,modular interactive interface,development architecture,development model and third-party map software The best solution.Then,the 10 k V distribution network ring main unit elimination auxiliary system is designed and implemented,the interactive interface is designed,the MVP architecture is used,and the system is designed and developed based on the Hybrid APP development model.Finally,perform functionalmodule,synthesis and field test on the system.The 10 kV distribution network ring main unit elimination auxiliary system developed and designed in this paper is highly reliable,has good adaptability and stability on different mobile phones,has a good interactive interface,simple and easy-to-learn operation methods,and has a main Functions such as wiring diagram,address book and positioning navigation.The system can greatly shorten the time of elimination and the number of round trips in the elimination of defects,realize the transparency of geographic information of the ring main unit,paperless management of electrical drawings,reduce the operating time of equipment with failure,and avoid potential safety hazards and equipment decommissioning risks,improve the efficiency of distribution network operation and maintenance?...
Keywords/Search Tags:power grid construction, ring main unit, elimination auxiliary, distribution network operation and maintenance, system design
PDF Full Text Request
Related items