Font Size: a A A

Hunan Rural Safe Drinking Water Project In The PPP Mode Application Research

Posted on:2018-12-10Degree:MasterType:Thesis
Country:ChinaCandidate:W YeFull Text:PDF
GTID:2393330566963707Subject:Agricultural engineering
Abstract/Summary:PDF Full Text Request
Hunan rural drinking water safety problems still exist,along with the advancement of new countryside and new urbanization construction,the government also need to invest a lot of money to provide water supply project construction.Issued in Hunan provincial water resources bureau "" much starker choices-and graver consequences-in " in Hunan province water conservancy development plan " put forward: " to fully solve the problem of rural drinking water safety in poverty-stricken areas ",the contradiction between it and the government under a lot of financial pressure stand out,not only that,in the infrastructure there has always been to "rebuild light tube" phenomenon,namely the government construction and ignore the operation management,and in the PPP mode(that is,the Public-Private Partnership-acronym),by the introduction of social capital at the same time also involve social capital in the operation of the project,can promote the transformation of government functions,improve the efficiency of the operation of the project.In the country issued a series of policy documents after the application of the PPP mode,the thesis related to the use of PPP model in the investigation and study,the PPP mode in Hunan rural safe drinking water project for do a deep analysis from different angles,so as to Hunan rural drinking water engineering and provides the reference for the construction of rural water conservancy project.The main topics of the paper include:The first part,background.Firstly,the paper studies the background,purpose and meaning of the paper,and researches the status quo,contents and methods of research and research at home and abroad.The second is the PPP financing model.This paper mainly reviews PPP model definition,basic characteristics,basic form,applicability and payment mechanism.In addition,the present situation and problem of the safe drinking water project in rural Hunan are introduced.This paper mainly studies the present situation of drinking water project in rural Hunan,and finds many problems and shortcomings.The second part,the PPP model applied necessity and feasibility analysis in the rural safe drinking water project in Hunan.First is feasibility,through the PPP mode in Hunan rural safe drinking water project for application of theoretical basis and practical basis for analysis and discussion,through the PPP mode application can effectively solve the problem of Hunan rural safe drinking water project.Moreover,the feasibility is different according to the engineering nature,and the PPP model is different in the safe drinking water project in Hunan.It is feasible to apply the value theory to the PPP model in the rural safe drinking water project in Hunan province by selecting the actual case.The application of PPP model can ease the government's financial pressure and promote the development of safe drinking water project in Hunan.The third part,conclusion and suggestion.In this paper,the application of PPP model is very promising in the rural safe drinking water project in Hunan,and puts forward some Suggestions for its application.
Keywords/Search Tags:Safe drinking water engineering, The PPP mode, Value for money, The feasibility analysis
PDF Full Text Request
Related items