Font Size: a A A

The Potential Evaluation Study On The Intensive Use For Construction Lands In The Central Urban Of Yingctan City

Posted on:2018-09-16Degree:MasterType:Thesis
Country:ChinaCandidate:Z Y YuFull Text:PDF
GTID:2429330548987925Subject:Agricultural Extension
Abstract/Summary:PDF Full Text Request
In 2000,the Ministry of land and resources firstly promulgated the relevant laws and regulations for the potential evaluation of the urban lands intensive use:"Implementation plans for the potential evaluation of the urban lands intensive use in 2000",on the basis of this regulations,the scholars slowly began to study on the potential evaluation of intensive use for the urban lands,in November 2014,the Ministry of land and resources published the "operation manual for the economy and intensive use evaluation of the urban construction lands",from then on,the potential evaluation of the intensive use for the urban lands has the corresponding evaluation procedures and operating manuals,the scholars are also more normative about the related research on the potential evaluation of the intensive use for the urban lands.Under the background of this research,through detailed reading the "operation manual for the economy and intensive use evaluation of the urban construction lands",this study analyzes the present situation of construction land use in the central urban of Yingtan City,put forward the potential evaluation processes and methods of the intensive use for the construction lands in the central urban of Yingtan City according to the "operation manual for the economy and intensive use evaluation of the urban construction lands".Then according to the evaluation processes and methods,this study calculates the intensive use potential based on the comprehensive transformation of the construction lands in the central urban of Yingtan City,and calculates the intensive use potential based on the transformation of the actual conditions for the construction lands in the central urban of Yingtan City,finally,according to the calculation results and conclusions of the intensive use potential for the construction lands in the central urban of Yingtan City,this study analyzes the tapping potential characteristics of the intensive use potential for the construction lands in the central urban of Yingtan City,put forward the imperfections of the intensive use potential for the construction lands in the central urban of Yingtan City,and put forward the concrete suggestions.This study mainly includes 6 parts:introduction,the theoretical basis of the potential evaluation study on the intensive use for construction lands in the central urban of Yingtan City,the current situation analysis of the construction lands use in the central urban of Yingtan City,the potential evaluation of the intensive use for the construction lands in the central urban of Yingtan City,the perfect proposals of the intensive use for the construction lands in the central urban of Yingtan City,the study conclusion and discussion.One of the most important is the current situation analysis of the construction lands use in the central urban of Yingtan City,the potential evaluation of the intensive use for the construction lands in the central urban of Yingtan City,the perfect proposals of the intensive use for the construction lands in the central urban of Yingtan City in 3 parts.Based on the general current situation of the natural,environment,economy and society in Yingtan City,the current situation analysis of the construction lands use in the central urban of Yingtan City,defines the category of the central urban and the construction lands for the central urban in Yingtan City,and analyzes the current situations of the construction lands use in 2014 in the central urban of Yingtan City,that is,in 2014,the construction lands area in the central urban of Yingtan City was 3403.89 hectares,within the present situation of construction lands use,the residential lands area was 1396.94 hectares,the commercial lands area was 218.48 hectares,the industrial lands area was 555.74 hectares,the education lands(lands for university)area was 107.72 hectares,the education lands(lands for primary and secondary schools)area was 53.56 hectares,the lands for organizations and groups area was 129.10 hectares,the lands for urban road and traffic facilities area was 497.35 hectares,the park and green lands area was 203.31 hectares,the square lands area was 5.39hectares,the other construction lands area was 236.30 hectares.These are signs that the main construction lands was the residential lands in 2014 in the central urban of Yingtan City.Based on the functional areas division of the constructions land,the potential evaluation of the intensive use for the construction lands in the central urban of Yingtan City,put forward the potential evaluation processes and methods of the construction lands intensive use in the central urban of Yingtan City according to the "operation manual for the economy and intensive use evaluation of the urban construction lands".Then according to the evaluation processes and methods,this study calculates the intensive use potential based on the comprehensive transformation of the construction lands in the central urban of Yingtan City,and calculates the intensive use potential based on the transformation of the actual conditions for the construction lands in the central urban of Yingtan City.Through calculations,in December 31,2014,the absolute scale potential which is based on the comprehensive transformation of the construction lands in the central urban of Yingtan City was 1174.05 hectares,which was involved 206 functional areas;the economic potential which is based on the comprehensive transformation of the construction lands in the central urban of Yingtan City was 1456956.35Million yuan,which was involved 184 functional areas;the absolute scale potential which is based on the transformation of the actual conditions for the construction lands in the central urban of Yingtan City was 1086.84 hectares,which was involved 164 functional areas;the economic potential which is based on the transformation of the actual conditions for the construction lands in the central urban of Yingtan City was 3319530.54 Million yuan,which was involved 155 functional areas.The perfect proposals of the intensive use for the construction lands in the centralurban of Yingtan City is based on concluding the tapping potential characteristics of the intensive use potential for the construction lands in the central urban of Yingtan City,the study summarizes the imperfections of the intensive use potential for the construction lands in the central urban of Yingtan City,finally,according to the imperfections of the intensive use potential for the construction lands in the central urban of Yingtan City,the study put forward the perfect proposals of the intensive use for the construction lands in the central urban of Yingtan City,including the general perfect proposals of the intensive use for the construction lands in the central urban of Yingtan City,and the perfect proposals for each functional areas of the intensive use for the construction lands in the central urban of Yingtan City.According to the technical specifications of the operation manual for the economy and intensive use evaluation of the urban construction lands" which was published by the Ministry of land and resources in November 2014,this study calculates the potential situation of the construction lands intensive use in the central urban of Yingtan City in December 31,2014,and based on the potential evaluation of the intensive use for the construction lands in the central urban of Yingtan City,this study summarizes the imperfections of the intensive use potential for the construction lands in the central urban of Yingtan City,finally according to the imperfections of the intensive use potential for the construction lands in the central urban of Yingtan City,this study put forward the perfect proposals of the intensive use for the construction lands in the central urban of Yingtan City.Thus,this study is better interpreted the technical specifications of the "operation manual for the economy and intensive use evaluation of the urban construction lands",and put forward the typical practice foundation for future scholars on the application of the"operation manual for the economy and intensive use evaluation of the urban construction lands".
Keywords/Search Tags:The construction lands, The potential evaluation of the intensive use, The central urban, Yingtan City
PDF Full Text Request
Related items