Font Size: a A A

Research On Improvement Of Estimation Value In Design Stage Of Government Investment Project

Posted on:2019-10-20Degree:MasterType:Thesis
Country:ChinaCandidate:C YangFull Text:PDF
GTID:2429330566976856Subject:Technical Economics and Management
Abstract/Summary:PDF Full Text Request
The government investment project has important social and economic significance.In recent years,improving the management level of government investment projects and the efficiency of government investment have become the focus of social concern.However,the government investment project is faced with the difficult situation of uncontrolled investment and low overall investment benefit.Although the relevant departments attach great importance to it,it has not achieved the expected effect after years of rectification.The design stage is the key period to improve the investment benefit.The budget estimate has an important index to measure the economy of the project and the important value of the auxiliary project design in the design stage.It can greatly improve the efficiency of the government investment.However,the current estimation value in the government investment project design phase is seriously underestimated.The estimation is largely a form of meeting the requirements of the program.The maximum value of the budget estimate is considered to help the project through approval.This paper takes the estimate value of the design phase of the government investment project as the research object,analyzes the present situation,the problems and the reasons,and constructs the improved system according to the analysis results,in order to achieve the goal of giving full play to the estimate value of the design stage,to improve the value of the design scheme,and to improve the value of the government investment projects,and to improve the government investment.Benefit and save social resources.The main research contents include:(1)Give an idealized definition of budgetary process and define budgetary value by combing budgetary estimate.(2)Through literature analysis and expert interview,we get five situations of present situation of the present state of the estimate value of the government investment project design stage.Through combing the documents,the paper studies the budget management model of the government investment projects,and draws the conclusion that the current budget management of the government investment projects adopts the "control as the purpose and the examination and approval as the core means".Pattern;(3)Through literature analysis,expert interview and logical reasoning,this paper analyzes the problems and causes of the budget estimate in the design phase of the government investment project,and concludes that the reasons for the current government investment project design phase estimate value are three aspects: concept,management system and technology.(4)According to the analysis of the problems and reasons,from the three dimensions of the concept,management system and technology,the integrated improvement ideas are adopted to construct the improvement system of the estimate value of the government investment project design phase,integrating the management organization,the theoretical research force and the technical force,and concentrating on the three aspects of the idea,the management system and the technology.To achieve the purpose of budgetary value in the design stage.
Keywords/Search Tags:government investment project, design stage, estimation value, improving system
PDF Full Text Request
Related items