Font Size: a A A

Research On Cost Control Management Of Government Investment Agent Construction Projects

Posted on:2019-10-17Degree:MasterType:Thesis
Country:ChinaCandidate:W DingFull Text:PDF
GTID:2429330572450593Subject:Public Administration
Abstract/Summary:PDF Full Text Request
At the present stage,the management mode of agent construction system has been widely used in Chinese governments' investment project management,but it is still in the initial stage of summarizing practical experience,as to theoretical and systematic literature is still insufficient,and the system construction is not scientific,systematic and normative.Government as an administrative regulation,the owner,project construction and operations management,and other multiple identities,and often limited by inadequate regulatory program trivals,professional and technical strength,management level is not enough,a direct result of government fiscal investment projects are uncontrollable,the standard is uncontrollable,the cost is uncontrollable,has been far unadaptble to the transformation of government functions.HD area combining with guangzhou cases of the nursing home project cost control management,through the implementation of the project decision-making stage,design stage,construction stage and completion stage of cost control of the situation analysis,analysis of the pros and cons of Chinese government construction project cost control management,put forward the optimization suggestion: improving the legal system construction,clearing the ownership of government and the administrative examination or approval departments,clearing construction units and cooperated-builing service work interface;Clarifying legal status,equal rights and responsibilities;Establishing efficient and reasonable reward and punishment mechanism and improve management effectiveness through contract management;Building big data for cost control;Summarizing the experience and evaluating the post.How to control cost effectively is always a difficult problem for government financial investment of project management.Independent to perfect cost control model is set up,find a suitable system of construction project cost control,through varieties of ways to the construction project cost control link,change the traditional management mode,to avoid "built,tubes,with the integration of management pattern of government investment risk,scientific and efficient real-time dynamic overall cost control of construction project,finally to optimize the allocation efficiency of financial capital,realizing the cost benefit maximization.
Keywords/Search Tags:government investment, agent, cost control, Government owner, agent management
PDF Full Text Request
Related items