| A financial storm is sweeping through the world soon triggered by the world's super powerful nations.How to avoid the loss in the financial storm,even settle down and get on with life is the present enterprise urgent matter.Facing the so brutal external environment,the enterprise only then strongly practiced the internal strength in order to pass the crisis and win in the competition.Carrying out the scene management is an important measure for the enterprise practicing the internal strength,but the industrial engineering has provided the powerful technical guarantee for the scene management carrying out.The Shaanxi Fenghuo Communications Group Co.,Ltd.is a core enterprise in communication equipment and the electro-acoustic equipment scientific research production in China.It is the country "15" key enterprise.The company transferred the debt into the share of stock as a Limited liability company in 2001.The company has obtained the considerable development for the past ten years,and surpassed 20%speeds to continue developing with steady steps every year.With the sustained development of enterprise,the foundation management work especially the scene management work appears more and more important.In this paper,for the Shaanxi Fenghuo Communications Group Co.,Ltd.site management problems in the implementation and use of industrial engineering theory method for analysis of related technologies and optimize the program,and achieved satisfactory results.One of the production plant layout and mechanical processing equipment,the layout of the scene analysis of the use of technology road map has been optimized;on-site assisted machining operations and material storage facilities in the layout of the regional settings to use the principle of action for the economic analysis and optimization;materials stored on the use of the Treasury action analysis of technical,operational analysis techniques to conduct a detailed analysis of research.After the implementation of the above optimization program to improve enterprise productivity.At the same time,the popularity of in-house knowledge of IE,in order to continue to promote the site management to provide technical support,has laid a good foundation.In this paper,is the IE-related knowledge in the enterprise site management to implement the actual applications,fully embodied the theoretical guide for practice.This thesis is based on scene management theory,first of all on-site management theory involved the theory of industrial engineering in this article are summarized.Secondly,It has carried on the analysis to the Shanxi beacon-fire correspondence group Limited company's scene management present situation,has discovered the major effect factor which the scene management advances continually;Third,in view of the influencing factor,using the basic industry engineering correlation theories from the whole and partial has carried on the analysis as the detail,and has carried on the optimization design for the existing program;Finally It carries out the optimization plan and using PDCA circulation to improve continually,after the optimization,the plan has made the ideal result. |