| REsource Electric Tianjin Ltd.is engaged in renewable energy sector.But since the year of 2012,affected by volatility of the national policy,industry Over Capacity and other factors,the operation status of REsource Electric Tianjin Ltd.was poor.At the same time,the lead time of the product was too long to delivery in time.This disquisition is that use the basic method and tools of industrial engineering to shorten the lead time and reduce the cost of labor.By the way of looking into the plant,measuring,collecting and analyzing data,find out the extant problems,and use the technology of method study to improve and solve these problems to help cutting down the lead time and to respond the change of the market in time.This disquisition firstly present the problem that the REnergy Electric Tianjin Ltd faced.Then introduce method and purport of the subject of this research.After that is a brief of industrial engineering,introducing the basic theories of the method study.Then discuss the present situation and the future of industrial engineering at the background of global.And then Elaborate the reason that REnergy Electric Tianjin Ltd want to use the method of industrial engineering and how the industrial engineering works in the company.Meanwhile take some examples,especially for the product of converter,to explain that how we use industrial engineering tools and method,like method study,process flows,Line of balance,to finding out the problems,solving it,then reaching our goals of shorten the lead time and reduce the cost of labor.During the improve of the REnergy Electric Tianjin Ltd,it will be use the method of process flows,Why-Why,movement improve,which is belong to the 7 tools of industrial engineering,and also use the method of Value engineering,Line of balance,to Simplify or Rearrange the process.Finally shorten the lead time 26.6% and reduce the labor cost 19%.Summarized in this study of how the industrial engineering worked in the REsource Electric Tianjin Ltd,to ensure the implement of industrial engineering improvement successful in the company,firstly the leaders at the top must agree and support the improvement,then the influence factor of human being should be given priority to solve,meanwhile establish the standard time and capacity data base.Viewed from the system as a whole,use the tools of the basic industrial engineering to make improvement.Finally maintain the improvements by the standardized. |