Font Size: a A A

Study Of Productivity Improvement On Workshop Utilization In S Company

Posted on:2017-06-10Degree:MasterType:Thesis
Country:ChinaCandidate:J J MaFull Text:PDF
GTID:2429330596962248Subject:Industrial engineering
Abstract/Summary:PDF Full Text Request
S magnetics(H.K.)LTD is a famous company in head driver industry of computer manufactures.S company bring up a lot of employees in product making process.It go with the trend of manpower cost are increasing more and more under the words economic challenge.S company face to the press in utilization improvement.utilization had included main content,like as :shorten process lead time,less manpower,optimization of process and so on.more and more people pay more attention to study how to increase it and what solution can use it in routine management.If only rely to reduce salary or welfare of employee simply,so it will affect the stability of employee and future affect company development deeply.How to use lean production conception and Industry technology knowledge to solve existing problem on site management,such as: how to improve both utilizations of machinery and manpower and how to shortage material process lead time and optimize the complex factors of 5M1 E.so that to achieve the purpose of labor utilization improvement.in China.However,this company always keeps in mind to improve the efficiency of production line to reduce the unit cost,because of the strong competition in the marketing and shortage of raw materials,as well as the higher labor cost.In that case,Manufacturing System is developing towards digital,integrated,Internet-based and flexible directions.high-capacity,modern continuous production line from oversea to improve and upgrade the previous industry structure,which still have a poor efficiency or low capacity output.Based on the present situation,S company was implement the lend production system and Industrial Engineering,such as process analysis,production balance,engineering economics.and ergonomics,to find out the actual bottleneck in the whole production.Finally the SLP method conception to relay out current facility and machinery,S company adopt the flexible production line,and enhance on site management level.Build excellent culture and enriched operator entertainment.The feasible solution schemes were analyzed and put in practice.Finally solve and improve some problems.The workshop cost getting much improvement.
Keywords/Search Tags:Industrial Engineer, Lend production, SLP, cost, Utilization
PDF Full Text Request
Related items