| With the continuous development of engineering construction enterprises,the level of related project management is constantly improved,so the engineering project presents the characteristics of complexity,variability and scale.With the increase of all kinds of risks,project risk management is increasingly prominent.Along with the loss of risk,risk management also generates corresponding management costs for enterprises.In the engineering construction enterprises,effective project risk management,process operation system for the construction of the project is to provide rigorous,effectively avoid the unknown risks lead to direct or indirect economic loss of enterprise,for the enterprise to save the project construction cost,to improve the company’s management level,to contribute to the ability to cope with risks.Therefore,project risk management becomes more and more important.This article through to what ZJ had the company’s project operating conditions are studied.It study that paper by literature research method,field research method and case analysis firstly in this paper,the related theory of risk management knowledge and project management risk type,followed by detailed analysis what ZJ had companies operating environment and the status quo of the project management risk,and the description of system analysis,based on what ZJ had again of project risk management optimization design,the final offer to what ZJ had solution of the optimization of the project risk management problems,in order to improve their ability to resist risks.Based on the background of engineering construction enterprise risk management policy,from the construction company project management,to the situation of exploration in what ZJ had engineering and construction company as an example of project risk management policy of continuous improvement and effective implementation method,and based on this put forward the improvement measures about what ZJ had to risk management,mainly includes the company organizational structure optimization,the system establishment and security risks,risk system constraints and the related functional department appraisal system.The concept of modern risk management and comprehensive corporate risk management are carried out from top to bottom,with a view to contributing to the risk management of ZJ company in the project operation. |