Font Size: a A A

Research On Optimization Of Overseas EPC Logistics Management Of Power Construction A Company

Posted on:2019-04-17Degree:MasterType:Thesis
Country:ChinaCandidate:H Y LiFull Text:PDF
GTID:2439330548965256Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Compared with the traditional turbine projects or other domestic logistics industry,logistics management of overseas EPC project has its special place,one is abroad than domestic projects has many risk factors.At present based on overseas EPC project risk control of theoretical research,but most of all is applying the risk theory from the Angle of the EPC project master degree of risk identification research,especially tend to prophase bidding and the Angle of financial management.As a logistics management point of view,in the face of existing project implementation stage,how to design research of risk management,risk identification,risk analysis,and analysis and evaluation,selected a system scientific,accord with the actual overseas EPC project risk management approach to the turbine enterprise logistics management has very important practical significance.2 it is logistics management involves the international shipping and transportation,control is difficult.As the general contractor in turbine company control become the focus of the third party logistics,the shipper,turbine enterprise is difficult to effectively control the logistics links,the accuracy and timeliness of logistics is not certain,appear even the third party logistics subcontractors list alone is strong,make overseas EPC project logistics management in a very passive state.Visible,further optimize turbine means and methods of enterprise logistics management,while strive to reduce logistics cost effective control of give attention to two or morethings,is a key to improve the level of turbine enterprise management.Three is the EPC project information data is difficult to standardise many suppliers.Overseas EPC project logistics information management model needs to be from the extensive to accurate,efficient,box parts list,a subsidiary,the information of shipping mark is not unified logistics operation of the personnel shall not bear the light,but the consequences of a seemingly small number of defects is very serious,in the process of the list with supplier delivery box appears in listing defects,lead to the delivery of statistical bias,and customs declaration according to don't match;Port third party logistics company with a list to receive the goods,if the box parts list and shipping mark information,lead to port logistics company check is difficult when receiving equipment,railway needed to frequent;List box of a subsidiary of inconsistent with box parts,cause the site materials management out of the box and use feedback often missing parts,leakage problem.Overall there are statistical chaos,more impossible to judge the real-time status.Visible,overseas EPC project in the logistics information management needs to be on the agenda.This article is from the three dimensions to turbine part A company to carry out overseas EPC project as the background,overseas EPC project logistics management optimization research,on the basis of the existing use of logistics management,risk management and information management theory as the support,based on the turbine status of A company's overseas EPC power station project,the logistics management in whole process of its overseas EPC project after investigation and research,establishing the index of the above three dimensions as A class,each index all have its corresponding secondary indexes,through the analytic hierarchy process(AHP)and fuzzy comprehensive evaluation method to further scientific assessment,we can for the evaluation of objective and targeted on the problems existing in the three dimensions,or have further room to improve,make more constructive measures.Such as:the science of logistics outsourcing choice,the choice more scientific,reliable,third party logistics is the foundation of offshore EPC logistics management;For the execution of A project,to further strengthen the construction of logistics information management system,here is the original information management based on the introduction of more new,function more complete information management system,to many logistics information uniformity,fundamentally improve the turbine for logistics information control A company;,of course,we as the point of view of logistics management,in the face of overseas EPC many risk factors,suit the remedy to the case of the idea,on the premise of do the original basic work,the more comprehensive system to deal with the potential risk of different overseas EPC,reasonable response measures,in order to reduce the level of overall risk of turbine A company overseas EPC,promoting the comprehensive management ability of the company.Aimed at the deep-seated reasons for back problems and focus on design,the whole process from the source to the end of the logistics management of comprehensive research and design of optimization scheme.
Keywords/Search Tags:Electric power construction, logistics, management, optimize
PDF Full Text Request
Related items