| Urban and rural construction land reduction as a important way to deal with the non-capital function alleviation and to lead high-quality development,has important implications for reversing the current resource aggregation development model and achieving the transformation towards innovation resources driving and high-quality development in Beijing and even beijing-tianjin-hebei.Beijing City Master Plan(2016-2035)made various development indexes of districts such as decrement task,population scale,land scale and building scale in municipalities,which has been clear about the development blueprint.But at the district level,there are various real issues to implement reduction task.Therefore,carrying out the decrement development idea,integrating ” multiple plans”target into resultant force and sorting out the problems and countermeasures are of importance in guiding realization of the implementation of reducing.As reform of national natural resource agency begins,various industries planning leads to further integration development under the heads of the national land space planning.Under the background of "Integrating multiple plans into one",integrating multi-objective planning into resultant force of space governance provides the beneficial system support for curbing disorder and inefficient growth of urban and rural construction land and promoting quality decreasing with quality improving development.In this paper,by using research method of qualitative and quantitative analysis,inductive analysis,literature research and combining theory with empirical case,analyse systematically the current practical significance and challenges of reducing development.Combined with issues that reducing development is faced with,such as unclarity of the base number,division of multiple plans and management system and mechanism problems and reasons,based on the specific urban and rural construction land control objectives and tasks,starting with planning compilation principle of global space control and ecological priority under the background of new era,in allusion to scale,structure and distribution status quo of urban and rural construction land in Mentougou district,this study summarizes systematically land use current situation of the development in recent years and urgency of reducing development and analyses systematically the policy requirements of it.Establishing urban and rural construction land reduction implementation system based on "Integrating multiple plans into one" is proposed problem-orientedly,then three security systems which include the technical system,the operating system and the rule system are formed.To take practice of urban and rural construction land reduction in Mentougou district as an example,in terms of optimizing decrement decomposition goal,constructing a base structure with clear rights and specific responsibilities and strengthening guide of the national land space planning,this paper proposes reducing implement ways and means accord with the actual situation of Mentougou district.Moreover,this study attempts to explore the countermeasures for the implementation of construction land reduction from multiple dimensions,and through practical research putsforward suggestions on strengthening multi-level management mechanism,establishing a mutually supportive policy guarantee system and strengthening the overall planning and implementation.In order to further innovate and improve the implementation mechanism of urban and rural construction land reduction,strengthen the coordination of multiple regulations in the new era and guide the implementation of the reduction policy,this paper can provide practical experience and case reference. |