Research On The Quality Management Of Rehabilitation Project Of Harbin Children And Teenagers Activity Center

Posted on:2022-05-19Degree:MasterType:Thesis
Country:ChinaCandidate:Y LiuFull Text:PDF
GTID:2492306353478224Subject:Master of Engineering
Abstract/Summary:PDF Full Text Request
The restoration and renovation project of Harbin Children’s Activity Center is a key public construction project invested and constructed by Harbin municipal government,which has high requirements on the construction quality of the project.But due to the early stage of project establishment,project quality management system is not perfect,the overall deployment of quality control work are certain deficiencies,project quality control in the organization,materials,equipment,technology and environment aspect also has certain problem,to a certain extent,reduces the project quality control technology,high quality risks to make the project.In order to ensure that the reconstruction project of Harbin Children’s Center can complete the construction tasks with high standards on time and ensure the completion of the project with high quality standards,it is necessary to improve and perfect the existing quality control mechanism of the project,so as to ensure that the quality control work can be smoothly promoted and achieve good results.Based on the basic construction situation of the transformation project of Harbin Children Children Center,this paper analyzes the characteristics of the project and the status quo of quality control,and puts forward the main problems of quality control of the project from the aspects of organization,material,equipment,technology and environment that affect the quality control effect of the project.In view of these problems,the paper,based on the total quality management and continuous improvement ideas,establishes the improvement plan of quality control of Harbin Children’s Center renovation project,and defines the main measures of quality control of the project.Firstly,the project quality control responsibility and project quality control training should be implemented to improve the quality control level of raw material procurement and improve the quality control measures of raw material storage.At the same time,the construction equipment maintenance and enhance the quality inspection equipment configuration,improve the quality control technical plan,and do a good job in the prevention and control of common quality problems of the project,finally,strengthen the environmental control of the project construction site,reduce the impact of seasonal construction on quality.On this basis,the paper formulated the project preparation stage,the construction process,completion acceptance of each stage of the project quality control of the main measures,and for the project quality control improvement plan and implementation process,Through the renewal of project quality control ideas from the idea of ideas,strengthen the construction of project quality control system,improve project quality control technical level,guarantee project quality control fund supply and other measures to effectively promote the improvement of project quality control and achieve good results.Thesis research to solve the problem of ha fewer center renovation project quality control at the same time,summarizes the project quality control related theoretical methods and technical tools application in the repair renovation project experience,can to some extent,enrich the study of the theory of the engineering project quality control at the same time,for the development and implementation of the project quality control work provide theoretical guidance,Ensure the quality control of Harbin Children’s Center renovation project to achieve good results.
Keywords/Search Tags:Harbin Children’s Center Reconstruction Project, Influencing factors, Quality control, Safeguard measures
PDF Full Text Request
Related items