| With the rapid growth of the national economy,the role of electric power as the energy pillar of economic growth is increasingly prominent.People pay more and more attention to the level of power grid planning and construction.As we all know,the distribution network faces the user layer directly,which is the lowest link in the power grid system,and also the most direct link of user experience.For a long time,China has ignored the planning and construction of distribution network,and the planning and management level of distribution network is low,which directly restricts the improvement of distribution operation and maintenance level and the improvement of grid reliability.Based on the current situation of distribution network development in Longchuan eco industrial new town,this paper will use scientific planning and management concepts,with forward-looking planning ideas,grid layout,differentiated planning as the concept,in-depth study and carry out scientific,reasonable and orderly target grid planning,so as to make the future distribution network construction of Longchuan eco industrial new town have direction and goal,and avoid The investment waste caused by repeated construction and disordered construction is of great guiding significance to support the comprehensive and sustainable development of the future economy and society of the ecological industrial new town of Longchuan County.The distribution network planning scheme described in this paper will focus on the development of ecological industrial new town in Longchuan County.The full text will follow the refined planning idea of "status analysis → problem mining → proposal →comprehensive evaluation" to conduct in-depth research layer by layer.Focusing on the current situation of the power distribution network in the new eco industrial town of Longchuan County,this paper analyzes and judges the short boards existing in the existing power grid,and uses a variety of load forecasting methods to scientifically predict the load development trend of the new eco industrial town of Longchuan County in the next few years,then puts forward a feasible project planning scheme,and finally evaluates and analyzes the operation indicators and comprehensive benefits after the implementation of the scheme 。Timely research on the distribution network planning scheme of Longchuan eco industrial new town can effectively fill the gap in the distribution network planning of theindustrial park,and provide reliable technical support for building a strong distribution network framework of the industrial park in the future.At the same time,some distribution network planning principles and ideas proposed in this paper can also provide some reference for the power grid planning of industrial parks in other regions of China. |