As a pillar industry of the national economy,the construction industry has played a vital role in my country’s economic development.Prefabricated construction has many characteristics such as short construction period,green and low-carbon,low environmental pollution,and reduced construction costs.In recent years,as the direction of industry upgrading,it has been actively tried.These policies and measures have promoted the development of prefabricated buildings.effect.At the same time,we must see the shortcomings and deficiencies of prefabricated buildings,such as short research and development time,insufficient actual work experience,and uneven engineering quality.Therefore,it is very necessary to manage the quality management of prefabricated projects through scientific and effective methods.At present,scholars have conducted research on the quality management of a single link of prefabricated project engineering,such as the quality management of the prefabricated project construction site,the use of BIM to deepen the quality management of the prefabricated project engineering design,etc.,but the research is in multiple stages and even the entire process.The quality management of the company is still relatively rare from the current point of view.The research combines total quality management with various influential factors in construction,uses 5M1 E and system analysis to analyze the quality management problems of its construction system,and then according to the design phase of the drawing,the prefabricated component production phase,the on-site construction phase and the later operation and maintenance phase.Steps and the six aspects of the system framework of "people","machines","materials","methods","tests" and "circles" optimize the quality management system of company A’s prefabricated projects,and give qualitative optimization methods And strategy.Next,the optimization plan strategy proposed above is unnecessary to put forward ideas and ideas on guarantee,mainly from personnel,technology,capital chain,etc.to provide all-round guarantee,so as to hope to carry out a comprehensive and feasible improvement of the assembly project quality management system of A company.Finally,select the typical prefabricated project of company A-Project S,and verify the feasibility of the optimization plan and safeguard measures with examples,and give an evaluation of the optimization effect to demonstrate the feasibility of the optimization plan.The research hopes that through the optimization and improvement of the quality management system of the prefabricated project of Company A,the construction quality can be guaranteed while reducing costs,energy saving and emission reduction,and actively carrying out technological upgrades in response to the national call,and can provide certain assistance to the quality management of similar projects of the company With reference. |