Font Size: a A A

Research On The Performance Evaluation Of The Policy Implementation Of The Second Phase Project Of Natural Forest Protection In Yichun City

Posted on:2022-05-07Degree:MasterType:Thesis
Country:ChinaCandidate:M X ZhangFull Text:PDF
GTID:2493306320972379Subject:Administrative Management
Abstract/Summary:PDF Full Text Request
The Natural Forest Protection Project is an important ecological project in China,and the implementation of the Natural Forest Protection Project policy has had a profound impact on the restoration of forest resources and the development of state-owned forest areas in China.In the context of the end of The Second Natural Forest Protection Project,it is important to scientifically and effectively evaluate the effect of the implementation of The Second Natural Forest Protection Project policy in Yichun City,explore the problems encountered in the implementation of The Second Natural Forest Protection Project policy in Yichun City,and give feasible policy suggestions to improve the subsequent the Natural Forest Protection Project policy in Yichun City and enhance the quality of the implementation of the Natural Forest Protection Project policy in the next step.This paper takes Yichun City,a state-owned forest area in Heilongjiang Province,as the research object.Through an extensive and in-depth survey of the local situation and the opinions of forestry experts,scholars and local residents,we adopt a scientific method to evaluate the policy implementation performance of the second phase of the Natural Forest Protection Project in Yichun City,analyze the problems in policy implementation and give targeted policy recommendations.This paper is divided into the following parts to evaluate the policy implementation of the second phase of the Natural Forest Protection Project in Yichun.Firstly,according to the background of the study,the research subjects are combined with the current academic research frontier,and the basic concepts and theoretical foundations of this paper are elaborated to sort out the theoretical basis of the paper,so as to lay a feasible foundation for the evaluation of the policy implementation effect of the second phase of the Natural Forest Protection Project in Yichun City and the relevant suggestions for improving the policy implementation.Secondly,the paper presents a general overview of Yichun City in terms of natural resources,economic industries and social livelihoods;reviews relevant information and presents an overview of the implementation of the Natural Forest Protection Project policy in Yichun City in terms of implementation history and content;analyzes the problems in the implementation of The Second Natural Forest Protection Project policy in Yichun City in relation to the actual situation of policy implementation.Based on the principles of comprehensiveness,feasibility,etc.,the evaluation index system of the implementation effect of The Second Natural Forest Protection Project in Yichun City was constructed by using the hierarchical analysis method,and the weights of the relevant indicators were calculated.Further,the fuzzy comprehensive evaluation method is applied to empirically analyze the relevant policy implementation performance,and the evaluation results are obtained and analyzed in depth.Finally,based on the qualitative and quantitative evaluation results of the implementation effect evaluation of The Second Natural Forest Protection Project in Yichun City,we propose policy recommendations to improve the subsequent Natural Forest Protection Project in Yichun City,and provide theoretical references for the implementation of the subsequent Natural Forest Protection Project and natural forest restoration work in Yichun City,taking into account the problems encountered in the implementation of The Second Natural Forest Protection Project.
Keywords/Search Tags:The Second Natural Forest Protection Project, Policy Implementation Effect, Fuzzy Comprehensive Evaluation Method
PDF Full Text Request
Related items