Research On Schedule Management Of Campus Dual Prevention Project In China Mobile HN Company

Posted on:2022-03-26Degree:MasterType:Thesis
Country:ChinaCandidate:Y C WangFull Text:PDF
GTID:2507306326996719Subject:Master of business administration
Abstract/Summary:PDF Full Text Request
Constructing the dual prevention system of school fire safety risk identification and control and hidden trouble detection and management is a major measure to promote the implementation of school safety responsibility under the new situation,and an effective measure to improve school safety management level.The dual prevention project has obvious policy orientation and strong reproducibility.It is an important indicator of social development and an important content of comprehensive management of social security.Under the policy requirements of "improving quality and expanding coverage,and achieving full coverage of campus dual prevention mechanisms",it is necessary to conduct a more in-depth study on the schedule of campus dual prevention projects,so that the project tasks can be successfully completed within the specified resource and time investment.This paper focuses on the current status and schedule management of the HN mobile campus dual prevention project.First,it explains the background,significance and construction content of the HN mobile campus dual prevention project,and then uses the WBS project breakdown structure,network plan diagram and Gantt chart and other methods and Tool,sorted out the current status of the project’s schedule and duration,Identify problems such as extension of the construction period and low efficiency during the implementation of the project,and use questionnaire surveys,fishbone diagrams and other tools to analyze the problems,and summarize the key factors such as the organization plan,personnel management,and division of labor that are lagging behind the project.Through the analysis of the reasons,the correction measures were adopted to implement adjustments and improvements from the early,mid and late stages of the project,and the critical and non-critical paths of the project were optimized.Finally,the construction period of the HN mobile campus dual prevention project was smoothly shortened.At the same time,through improving the organizational structure,establishing a management system,establishing plan assessment,and attaching importance to communication mechanisms,etc.,to ensure the progress of the project schedule.Through the research and exploration of dual prevention project schedule management,the corresponding planning and transformation of the project process and procedures are made to effectively ensure the realization of the construction period and schedule plan,and provide strong support for the schedule management of dual prevention projects to ensure the smoothness of the project The completion is of very important practical significance,and it also provides a certain reference for the construction of other projects of the company.At the same time,it is hoped that under the call and requirements of the policy,it will provide certain reference and guidance for the campus safety construction of universities,primary and secondary schools in HN Province.
Keywords/Search Tags:Double prevention, project schedule management, schedule control
PDF Full Text Request
Related items