| With the national development and reform commission on to do a good job of hydropower project on immigration before construction notice(sent to change energy [2012] 293)release,and the state of survey and design industry is put forward of "focus on change parallel contracting mode,promote the project general contracting mode" of the policy guidance,has a large water conservancy and hydropower survey and design enterprise began to try to popularization and application in water conservancy and hydropower project resettlement mode of general contracting.DB mode(Design-Build)as one of the general contracting mode,the design and construction integration,has a significant advantage in quality,investment and progress,but because of the general contracting mode of water resources and hydropower engineering resettlement cost management of the related research is still relatively small,paper so on general contracting mode of water resources and hydropower engineering of resettlement cost management research.Paper from the Angle of the DB general contractor,JB site resettlement project construction project as an example to carry out the research,the research results are as follows:(1)The advantages and disadvantages of combed the DB mode,method of cost management,as well as the DB mode of cost management in different stages of the main contents of the design phase of the cost management should pay attention to the optimization of design scheme of adjustment and to design the control of product quality;The main content of cost management in construction decision stage is to make cost plan.The cost management in the construction implementation stage should focus on the control of the target cost.(2)Taking the construction project of JB resettlement project as an example,this paper analyzes the main contents of the cost management in the design stage,construction decision-making stage and construction implementation stage of the project,as well as the effect of the project cost management;(3)Put forward the problems in the cost management of water conservancy and hydropower resettlement project under DB mode,and put forward Suggestions for improvement.As an important part of hydropower project construction,resettlement work has the characteristics of sociality and complexity.The source of funds for resettlement projects is special funds.The state implements an inspection system for the allocation,use and management of resettlement funds.Generally,changes are not allowed after examination and approval.The construction of hydropower projects is guided by the principle of "immigration first,construction later",which makes the project attribute of "tight time and heavy task" of resettlement work more prominent.Through the above research,this paper provides a reference for the cost management reform of the same type of enterprises under the general contracting management mode of resettlement construction projects. |