Font Size: a A A

Study On Project Management Of Medium And Small Rivers In Jiang Xi Province Hydrology Monitoring In Construction Project

Posted on:2015-07-08Degree:MasterType:Thesis
Country:ChinaCandidate:L T HuFull Text:PDF
GTID:2180330467970123Subject:Project management
Abstract/Summary:PDF Full Text Request
The modem Projeet managemeni has become the hots Potsineethe1950s,Which has become the management method of all walks of life,The construction oflarge project is the typical example of the application of project management.With thestrengthening of the water industry investment, Hydrologic industry in China hasbeen rapid development,How to develop and perfect our country’s hydrologicalinfrastructure construction engineering project management further,Hydrologicindustry in China has become an urgent need to study and solve the issue.This paper mainly to small and medium rivers in Jiangxi province hydrologymonitoring system construction project as a case,Quality management, in theconstruction phase of the construction of the project cost management and schedulemanagement conducted a systematic analysis and research,Summarized a set of newproject management plan,Has the role of reference and guidance in engineeringconstruction management of hydrological monitoring system in medium and smallrivers in Jiangxi province late.This paper firstly introduces the related concepts of project management,Introduces the project management in the quality, schedule, cost three elements,Briefly introduces the background, the characteristics of middle and small rivers inJiangxi province hydrology monitoring system of construction engineering andimplementation of process.Secondly, introduces in detail the status of quality management, the first phaseof construction engineering of middle and small rivers in Jiangxi province hydrologymonitoring system under construction progress management and quality costmanagement.Analysis of the existing quality management of middle and small riversin Jiangxi Province, the hydrological monitoring system in the construction of thefirst phase of construction project management schedule management, costmanagement issues.Finally, in view of the existing hydrological monitoring system in medium andsmall rivers in Jiang xi Province, the first phase of construction project inquestion,The original project was optimized in this paper, the redesign of the projectschedule, engineering quality and engineering cost management system.
Keywords/Search Tags:Hydrology, construction project, project management
PDF Full Text Request
Related items