Font Size: a A A

The Surface Mining Short-Period Plan System And Optimization

Posted on:2002-04-13Degree:MasterType:Thesis
Country:ChinaCandidate:W S ZhangFull Text:PDF
GTID:2121360092470380Subject:Mining engineering
Abstract/Summary:
Combining the HEIDAIGOU open-pit coal mine in this paper, on the foundation of detailed analysis current method to set up the mold and the estimating value theories, it is researched to set up the deposit model method suit HEIDAIGOU open-pit coal mine, and bring up a kind of improved inverse distance power, with considering different effect in different direction of the coal mine bed, and applying in the strip mine of HEIDAIGOU, and increased the estimating value. The geology information system of HEIDAIGOU open-pit coal mine established have the integrality and practicality, at the same time, the geology information system can be modified real time by using the open-pit's production geology and survey data. It was Established that are the open-pit mine the plan to draw up the system model, the dump to plan to draw up the system model, transport the network model, and the coal and rock optimization allot model. And can draw up the complex and detailing short-period mine plan, dump plan, and can control the coal quality etc. And can draw the geology, mining the sketch.
Keywords/Search Tags:Strip mine, estimating value method, geology information system, mine the plan, optimization
Related items