Font Size: a A A

The Research Of Gaoming Solid Waste Production At Present And In 2008 And It's Treatment

Posted on:2006-04-13Degree:MasterType:Thesis
Country:ChinaCandidate:Z Q CaiFull Text:PDF
GTID:2121360182456733Subject:Environmental Engineering
Abstract/Summary:PDF Full Text Request
A great deal of construction would be built in Foshan Gaoming Now material industry base in national torch plan-developing, a chance of developing with high speed was met after Gaoming becoming a district of Foshan. There would be a 20.7 percent increase of Gross National Product by the plan of industry development in Gaoming in each year. With such high-speed development, it is can be forecasted, as the foreign population and the industry business increasing and as the living horizontal elevating, there would be an increasingly increase with the living waste, the industry waste, the poisonous and the harmful waste (dangerous waste in industry and medical treatment etc.) etc. The pollution of the environment problem that brings would be gradually serious, the solid waste and the solid treatment has become a main countercheck to the environmental protection, city developments, and people life. The waste handles treatment project has been put forward in this research by the detailed inquisition on Gaoming district, from the industry solid waste, dangerous waste, life waste etc., and it is provided the technique and consult for the solid waste management of Gaoming district.The environment statisticses shows that there are 65.6 housand T of industry solid waste, 3.0 housand Tof dangerous waste, 160.2 housand T of domestic waste,0.2 housand T of dangerous waste of hospital in 2003.According to investigate, the handle systems in Gaoming district are simple ones, The recycling utilization rate of the industry solid waste is low, and the degree of disposal turn to harmless is lower. So much as a majority of it is mixed in the living waste filled to the field filled with waste; The management and the treatment of the dangerous waste in Gaoming are not standardized, and otherwise, and the ones of each town's are very simple, so as to the infiltration liquid overflowing to the surface water.According to forecasting, that there would be 466.7 housand T of industry solid waste, 11.8 housand Tof dangerous waste, 194.2 housand T of domestic waste, 0.4 housand T of dangerous waste of hospital in 2008.Based on the request of programming and environmental protection target of the province of Guangdong and Foshan, the project on solid waste in Gaoming put forwarded in this paper is viable. It is works for keeping with society and economy to moderates with environment.The treatment project for general industry solid waste: 1. Recycleing as raw material, for ceramic industry or cement industry; 2. Using as material for building, such as flying ash or slag; 3. Fertilizing, expect for sludge whose heavy metal is over the scale; 4. Landfill.The treatment project for dangerous solid waste: Supply the unit eligibled to for resource recovery, ren handle it for harmless.The treatment project for domestic waste: sanitary landfill.The treatment project for dangerous waste of hospital: consigning it to the unit eligibled to for being handled and managed.
Keywords/Search Tags:Gaoming, solid waste, production, treatment
PDF Full Text Request
Related items